Description and Requirements
20/142
netPLC C100 | Startup Guide
DOC090701UM02EN | Revision 2 | English | 2009-10 | Released | Public
© Hilscher, 2009
3.3 Requirements
for
Operation
Note:
Upgrade older versions of the
cifX Device Driver
necessarily on
the version
V0.945
.
3.3.1
Slot PLC
For the slot PLC operation as a master the following requirements must be
fulfilled:
Protocol
PROFIBUS-DP Master
The device driver
cifX Device Driver
has to be installed (from
V0.945).
Software
Installation
The netPLC CoDeSys Server has to be installed and must run, if
communicating via PCI with the slot PLC.
Firmware
The firmware NPC1CDPM.NXF has to be loaded into the slot PLC.
License
Licenses are required for the operation of the slot PLC NPLC C100-
DP/CDS-OPC as a PROFIBUS-DP Master as well as for CoDeSys
SP. These licenses are included in the scope of delivery.
Configuration
Die slot PLC must be configured using the configuration software.
Programming
The PLC program must be created with CoDeSys and loaded into
the slot PLC.
Communication
For communication slave devices for the communication system
PROFIBUS-DP are required.
Table 13: Requirements for operation of the Slot PLC