27
EURO 46 V10 Programming Manual
first detector.
It is also possible to walk test a single input by pressing
when the keypad displays ‘Walk Test
Areas?’
Soak Control
Any input may be placed on ‘soak test’ to prevent it from generating an alarm. If the input triggers
while the system is set, it will indicate the activation and enter the details in the system log. You can
also enter the number of days you would like the soak test to last, after this period the inputs will be
active.
PLEASE NOTE:
If an input triggers whilst on ‘Soak’ it will move on to the initial ‘Soak’ timer. Do not
leave this on ‘0’ as it will go live straight after failing.
Test Siren
Any outputs programmed with a siren or strobe configuration will be activated.
Do Battery Load Test
The Control Panel performs a check of the battery operation every 10 seconds by dipping the power
supply voltage momentarily and measuring the system voltage. If the battery voltage measures
below 8.9V, or the battery fuse has failed, a ‘Battery Fault’ warning will be generated. The panel can
be programmed to perform an automatic battery load test at every power supply at 7.00am each
day. This will drop the power supply voltage below the battery voltage, while monitoring the system
diagnostics. The test will not take place if:
•
The siren and/or strobe output are live.
•
The control panel is in Engineer Menu.
•
Any battery fault already present.
•
Any mains fault already present.
•
The site option is set as ‘No’.
If the test has already started it will be aborted if any of these conditions apply, other than entry into
Engineer Menu. If the test is aborted, it will not be performed until the next day. This is selected
in ‘Site Options’ under ‘Do Battery Load Test’. The test may also be performed as required, under
engineer control.
Test Outputs
All the programmable outputs on the control panel and/or output module(s) can be tested in the
menu by entering the output type number and pressing
to trigger. Pressing
again will stop
the output from triggering.
Test Communications
This function can be used to send a test signal to the ARC if the engineer is using SIA or Contact ID
to signal events. It can also be used to send a test SMS.
Fetch Time
This function is used to manually request the time from the cloud server if for some reason it has not
updated automatically.
Содержание Pyronix EURO 46 V10
Страница 62: ...62 EURO 46 V10 Programming Manual...
Страница 63: ...63 EURO 46 V10 Programming Manual...
Страница 64: ......