
44
Commissioning
➜
Dismantle the S-wall [1] side pieces and the S-mount [2] wall bracket of all S-racks
to be integrated in the cluster:
The S-wall [1] side pieces and the S-mount [2] wall bracket are
clipped on, no tools are needed to dismantle/assemble these
components:
➜
Place the S-rack [3] on a clean work surface.
➜
Pull the side pieces [1] upwards and at the same time, thread the retaining
elements [4] out of the profile holes.
➜
Pull the wall bracket [2] upwards and at the same time, thread the rear panel
screws [5] of the S-rack [3] out of the profile holes.
➜
Determine which S-rack is to operate as the master in the cluster: the master
S-rack is connected to the main CO
2
supply via the external CO
2
connection [3] at
the pressure reducer [2], and via the external LAN socket of the S-racks [5] to the
LAN socket of the S-console (not illustrated).
Содержание Smart S-biosystems 801620
Страница 35: ...Translation of the original instructions Page 36 65...
Страница 68: ...Traduction de la notice originale Page 68 97...
Страница 101: ...Traduzione delle istruzioni originali pagg 100 129...
Страница 134: ...EU Declaration of Conformity S rack...
Страница 135: ...EU Declaration of Conformity S box...