67
seasOn start-uP Maintenance checKList
To begin season start-up of your Heatmor Outdoor Furnace, assuming you followed the procedures
outlined in the “End of Season Maintenance Checklist,” follow the instructions below:
1. Remove cap from chimney.
2. Build fire in firebox and bring your furnace up to temperature. (Refer to the “Lighting the Heatmor
TM
for the
first time” section of the Heatmor
TM
Operations and Maintenance Manual.)
3. Once your furnace is up to temperature, you can start all pumps.
cautiOn:
It is recommended to start your pumps AFTER you bring your furnace up to temperature. This
helps ensure your system isn’t air locked and ensure your water is circuating correctly.
4. Your start-up is complete.
chaPter 21
Содержание Response 200 SSRII
Страница 1: ...Operations And Maintenance Manual...
Страница 3: ...Outdoor Furnaces TM THE save these instructions...
Страница 12: ...5 HEATMOR Stainless Steel RESPONSE Outdoor Furnace Model Chapter 1 Model 200 SSRII...
Страница 93: ...Outdoor Furnaces...