1. Connect one of the 24Vac transformer outputs to the actuator COMMON terminal on Terminal Block F of
the Motorized Ball Valve.
2. Connect the second 24Vac transformer output to the TMC Valve Common terminal (12) on the ETV
Platinum Plus module.
3. Connect the TMC Valve normally closed (NC) terminal (11) on the ETV module to the Motorized Ball Valve actuator
CLOSE
terminal on Terminal Block F
4. Connect the TMC Valve normally
open
(NO) terminal (13) on the ETV module to the Motorized Ball Valve
actuator
OPEN
terminal on Terminal Block F
NOTE:
Prior to wiring of the Motorized Ball Valve actuator reference the Motorized Ball Valve
installation manual - 059434-00 for detail instructions on the removal and re-installation of the actuator
cover
Figure 12A: TMC
Motorized
Safety Valveactuator wiring to the ETV module- valves sizes
1 1/2" and up
Figure 12B: TMC
Motorized
Safety Valveactuator wiring to the ETV module- valves sizes 1 1/4" and smaller
059305-00 Rev. D
Heat-Timer Corp.
24 ETV Platinum Plus Installation and Operation Manual
Содержание ETV Platinum Plus
Страница 9: ...ETV Platinum Plus Stainless Steel Valve Dimensional Specifications 9 059305 00 Rev D Heat Timer Corp...
Страница 31: ...Piping Diagrams 31 059305 00 Rev D Heat Timer Corp Figure 14B Two Mixing Valves and a TMC Safety Valve...
Страница 54: ...059305 00 Rev D Heat Timer Corp Notes 54 ETV Platinum Plus Installation and Operation Manual...
Страница 55: ...059305 00 Rev D Heat Timer Corp Notes ETV Platinum Plus Installation and Operation Manual 55...