059305-00 Rev. D
Heat-Timer Corp.
Wiring the Actuator – Two-Valve Application
1. Connection of the first Actuator:
a. Run the wiring through a knockout located on the bottom of the ETV Platinum Plus enclosure to the
Actuator terminal block.
b. Connect the Actuator voltage signal wire from Actuator terminal (Y) to terminal 16 on the ETV Platinum
Plus module.
c. Connect the Actuator ground wire from Actuator terminal (M) to terminal 14 on the ETV Platinum Plus
module.
2. Connect the second Actuator:
a. Run the wiring through a knockout located on the bottom of the ETV Platinum Plus enclosure to the
Actuator terminal block.
b. Connect the Actuator voltage signal wire from Actuator terminal (Y) to terminal 19 on the ETV Platinum
Plus module.
c. Connect the Actuator ground wire from Actuator terminal (M) to terminal 17 on the ETV Platinum Plus
module.
Figure 11:
Actuator wiring for a dual ETV valve application
22 ETV Platinum Plus Installation and Operation Manual
Содержание ETV Platinum Plus
Страница 9: ...ETV Platinum Plus Stainless Steel Valve Dimensional Specifications 9 059305 00 Rev D Heat Timer Corp...
Страница 31: ...Piping Diagrams 31 059305 00 Rev D Heat Timer Corp Figure 14B Two Mixing Valves and a TMC Safety Valve...
Страница 54: ...059305 00 Rev D Heat Timer Corp Notes 54 ETV Platinum Plus Installation and Operation Manual...
Страница 55: ...059305 00 Rev D Heat Timer Corp Notes ETV Platinum Plus Installation and Operation Manual 55...