68
PARTS REQUIRED:
x32
2" (5 cm)
19/32 x 2-1/2 x 28-1/2" (1,5 x 6,3 x 72,4 cm)
x4
ROR
19/32 x 2-1/2 x 30" (1,5 x 6,3 x 76,2 cm)
x4
AZ
WINDOW TRIM
5
FINISH
You have finished installing your windows and window trim.
Repeat steps 5 - 6 to install trim for
the second window.
6
Place
ROR
flush to
AZ
(Fig. C)
and center trim
horizontally on window.
Secure with 2" finishing nails.
Nail into window frame and studs behind.
Repeat to install other
ROR
.
11-1/2"
(29,2 cm)
11-1/2"
(29,2 cm)
Fig. B
2" finishing nails
into wall frame.
CENTER OF
WINDOW
CENTER OF
WINDOW
Place the inside edge of
AZ
11-1/2" apart
from the center of window, as shown
(Fig. B)
.
Center trim vertically on window.
Secure with 2" finishing nails at locations shown.
Nail into window frame and studs behind.
ROR
ROR
AZ
2" Finishing nails
Flush
Flush
Flush
Flush
Fig. C
AZ