44
24"
(60,9 cm)
24"
(60,9 cm)
24"
(60,9 cm)
24-3/8"
(62,9 cm)
24"
(60,9 cm)
24-3/8"
(62,9 cm)
PARTS REQUIRED:
ROOF PANELS
2" (5,1 cm)
Nails
Place (1)
47-7/8" x 48"
upper roof panel
flush to lower panel.
Ensure 3/4" measurement on the rafter
(Fig. A)
.
Move gable end rafter edge until it is
1/2" from the panel
(Fig. C)
.
Secure the panels with 2" nails
in each corner.
Place (2)
27-1/4" x 47-7/8"
upper
roof panels flush to installed panels.
Move gable end rafter edge until
it is 1/2" from the panels
(Fig. C)
.
Secure the panels with 2" nails in
each corner.
5
6
7
Fig. D
Maintain spacing between the center of the rafters for the lower panels
(Fig. D)
.
Secure panels with (1) 2" nail into the rafters, as shown.
Move to the top panels and keep spacing between the center of the rafters.
Secure panels with (1) 2" nail into the rafters.
NOTE:
Measurements from inside of gable panels
2" (5,1 cm)
x26
3/4" GAUGE
BLOCK
3/4" (1,9 cm)
Fig. A
3/4"
GAUGE
BLOCK
Flush
Flush
2" nail
in each
corner
7/16 x 48 x 47-7/8"
(1,1 x 121,9 x 121,6 cm)
x1
7/16 x 27-1/4 x 48"
(1,1 x 69,2 x 121,9 cm)
x2
47-7
/8" x 4
8
27-
1/4
" x
47-
7/8
"
27-
1/4
" x
47-
7/8
"
Flush
Move Gab
le
Move Gab
le
Fig. C
1/2"
(1,2 cm)