
46
Install all trim panels with primed side facing out.
PARTS REQUIRED:
GABLE END SOFFITS
Install left and right
73-5/16"
overhang boards flush to front wall
(Fig A)
and faligned to gable unit seam
(Fig B)
.
Secure with 2" finishing nails spaced approximately 8" apart.
Repeat steps to install soffit boards on the opposite side gable.
x80
2" (5,1 cm)
1
BEGIN
Your gable soffit panels are now installed.
FINISH
Fig. B
Flush to wall.
Fig. A
8"
(20,3 cm)
2" (5,1 cm)
Finishing Nails
Flush
at center seam.
x4
3/8 x 7-7/8 x 73-5/16" (1 x 20 x 186,2 cm)