
51
4
PARTS REQUIRED:
DOUBLE DOORS - GABLE WALL
OO
Flush
against wall panels.
Fig. A
OO
Center doors on panel seam, as shown
(Fig. B)
.
5
Check ledger board is still fush under panels.
Remove temporary supports and check doors open properly.
FINISH
Your double doors are now installed.
Fasten hinge boards to wall supports and floor with (10) 3" screws, as shown.
Make sure screws go into framing and foor
(Fig. C, D)
.
6
3" (7,6 cm)
Screws into the wall
support and foor frame.
Fig. B
SEAM
Fig. C
3/8"
(1 cm)
Fig. D
Angle 3" (7,6 cm)
Screw
Install temporary support
OO
as a ledger board
flush under wall panels for doors to rest on.
Secure with (3) 3" screws
(Fig. A)
.
3" (7,6 cm)
x12
OO
x1
69" (175,3 cm) Door Stiffener