
49
EAVE SIDE FASCIA
x40
2" (5,1 cm)
Position (2)
4-3/4" x 80-7/8"
fascia boards with primed side out, flush with roof panels and gable fascia
(Fig. A)
.
Secure with 2" finishing nails, (2) nails in each gable unit and rafter end, and (4) nails angled at the seam.
Repeat steps to install fascia on the opposite eave.
Your eave side fascia boards are now installed.
FINISH
1
BEGIN
PARTS REQUIRED:
x4
3/8 x 4-3/4 x 80-7/8" (1 x 12,1 x 205,3 cm)
Flush at
middle rafter.
2" (5,1 cm)
Finishing Nails
Flush with
roof panel.
Fig. A
Flush
Flush
Flush
SEAM
Install all trim panels with primed side facing out.
**Eave fascia may need to be trimmed to fit**