Heartland 16408 Скачать руководство пользователя страница 1

16408

Call Us First!

DO NOT RETURN TO STORE.

For questions on assembly or for general inquiries, you may contact us in the following ways:

Call customer service:

 1-877-743-3400

Did you enjoy building your shed? 

JOIN OUR TEAM

AND MAKE UP TO $1,500/WEEK*

o

r

 

v

is

i

t b

a

cky

ard

in

st

a

l

l

er

.

c

o

m

Flexible schedule 

No selling,

just building

Bonus incentives 

available

S

c

a

n

 t

h

f

 ow

c

o

de 

t

a

p

ply

 

to

d

a

y

.

INSTALLERS

WANTED

*based on number of completed installations

Call a Recruiter Today!  734-365-7000

visit us online at

help.backyardproducts.com

AVOID THE WAIT!

Submit a help request

Answers to frequently asked questions

Live chat with an agent

Содержание 16408

Страница 1: ...AM AND MAKE UP TO 1 500 WEEK o r v i sit backyardinstaller c o m Flexible schedule No selling just building Bonus incentives available S c a n t he f lowcode to apply t o d a y INSTALLERS WANTED based on number of completed installations Call a Recruiter Today 734 365 7000 visit us online at help backyardproducts com AVOID THE WAIT Submit a help request Answers to frequently asked questions Live c...

Страница 2: ...DC Puerto Rico 18 or older to participate Taxes on prize are responsibility of winner Odds of winning depend on the number of eligible reviews received Void where prohibited For complete details and official rules visit https backyardreviews net sweepstakes rules Scan QR code above Click write a review Find your product Tell us what you think Submit your review You ll be notified by e mail if you ...

Страница 3: ...ILLSDALE GABLE 10 x 12 304 8 x 365 8 cm A Backyard Products Company BUILDING RESTRICTIONS AND APPROVALS Be sure to check local building department and homeowners association for specific restrictions and or requirements before building ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits SURFACE PREPARATION To ensure proper assembly you must...

Страница 4: ...ion Level Gloves Framing lumber is graded for structural strength and not appearance Exterior trim is graded for one good side Always install the material leaving the best edge and best surface visible Please remember that these blemishes in no way negatively affect the strength or integrity of our product See Fig A B C A Safety Glasses Tape Measure Paint Tools Ladder Caulk Gun Hammer Level FINISH...

Страница 5: ... 1 9 cm x12 6 x 24 15 2 x 61 cm OSB OR WOOD GRAIN 1 x 3 x 72 1 6 x 7 6 x 182 9 cm x2 HJ x4 3 8 x 7 7 8 x 73 5 16 1 x 20 x 186 2 cm x4 3 8 x 5 7 8 x 73 1 x 14 9 x 185 3 cm x2 3 8 x 4 3 4 x 75 7 8 1 x 12 1 x 192 7 cm x2 3 8 x 4 3 4 x 75 7 8 1 x 12 1 x 192 7 cm x4 3 8 x 4 3 4 x 80 7 8 1 x 12 1 x 205 3 cm x12 2 x 4 x 4 7 8 5 1 x 10 2 x 12 4 cm CLA x4 3 8 x 1 3 4 x 82 1 2 1 x 4 4 x 209 6 cm x4 2 x 4 x ...

Страница 6: ...69 3 4 2 5 x 10 2 x 177 2 cm ZJ x2 19 32 x 3 x 72 3 2 x 7 6 x 182 9 cm x3 19 32 x 2 1 2 x 26 5 8 1 5 x 6 3 x 67 6 cm AH x2 19 32 x 2 1 2 x 62 1 5 x 6 3 x 157 5 cm AHR x1 19 32 x 2 1 2 x 62 1 5 x 6 3 x 157 5 cm AHL OO x3 69 175 3 cm Door Stiffener x1 x5 x1 x1 x2 x1 UNIVERSAL DOOR Right Left Painted Black on Ends x1 LEFT DOOR x1 RIGHT DOOR Painted Green on End Painted Red on End x1 3 8 x 23 7 8 x 84...

Страница 7: ...al Threshold x1 Spring Bolt x2 1 2 5 cm x8 4 screws in each package x2 T Handle x4 1 1 2 3 8 cm 2 screws in each package x2 5 1 2 Shaft 7 16 x 48 x 96 1 1 x 121 9 x 243 8 cm x2 7 16 x 48 x 47 7 8 1 1 x 121 9 x 121 6 cm x2 7 16 x 48 x 8 1 2 1 1 x 121 9 x 21 6 cm x4 7 16 x 27 1 4 x 48 1 1 x 69 2 x 121 9 cm x6 7 16 x 27 1 4 x 8 1 2 1 1 x 69 2 x 21 6 cm x4 NOTE If you are using a nail gun nails may be...

Страница 8: ...CED WOOD FLOOR FRAME OPTIONAL FOUNDATION OR FLOOR MATERIALS ADDITIONAL MATERIALS This shed does not include any floor or leveling materials Use our optional floor kit with building instructions and nails included See the FLOOR LEVELING section on page 9 for recommended methods and suggested materials to properly level your floor as this will vary depending on your specific site If you choose to in...

Страница 9: ...sill plates Fasten 2 x 4 5 1 x 10 2 cm sill plates to slab using approved concrete anchors fasteners not included Check local code for concrete foundation requirements NOTES Allow new concrete slabs to cure for at least seven 7 days 2 x 4 x 10 5 1 x 10 2 x 244 cm Caulk Requires x2 x2 x1 MUST be treated lumber MUST be treated lumber 120 304 8 cm 120 x 144 304 8 x 365 8 cm 137 348 cm 10 x 12 304 8 x...

Страница 10: ...1 9 x 243 8 cm x4 x1 x40 x60 1 lb of 2 5 1 cm Hot Dipped Galvanized Box Type Nails 40 Nails 3 7 6 cm Hot Dipped Galvanized Box Type Nails 3 7 6 cm 2 5 1 cm 3 7 6 cm MATERIAL REQUIRED MUST be treated lumber 4 x 4 x 12 10 2 x 10 2 x 365 8 cm x3 Screws for Frame to 4 x 4 Minimum 3 screws exterior grade 144 365 8 cm 120 304 8 cm 117 297 2 cm 16 40 6 cm 16 40 6 cm D O U B L E D O O R S I N G L E D O O ...

Страница 11: ...s in 1 2 4 or 8 thickness Asphalt Shingles 8 Block 4 Block Gravel Gravel Do not exceed 16 4x4 Runner Shingle Shingle Maximum between leveling material locations 48 12 2x4 Treated Lumber 2 Block Level 12 3 Screws angled into 4 x 4 2 at each frame contact point Runners are generally 12 30 5 cm from ends of floor frame and under seams FLOOR FRAME NOT INCLUDED OPTIONAL WOOD FRAME FLOOR LEVELING OPTION...

Страница 12: ...ent will be approximately 187 7 16 496 3 cm When the frame is level and square secure one side of frame to the 4x4 runners using one fastener at ends of each runner Move to the opposite end of the frame Secure the frame to 4x4 runners with one fastener at ends of each runner making sure the frame remains square Fig A Once the floor frame is level and square fasten the frame to the 4x4 runners at e...

Страница 13: ...evel after installing floor panels Re level if needed HINT IMPORTANT The floor should be used as a stable work surface for wall construction Organize your assembly procedure during the build process to avoid over handling of the walls EAVE SIDE WALL Your door location may vary ...

Страница 14: ...ding the main roof rafter jig Proceed to assemble your rafters 120 304 8 cm 144 365 8 cm 3 4 1 9 cm AL x2 BEGIN 1 Secure 1 AL flush to the floor deck with 2 3 screws Measure over 120 3 4 and install a second GPC flush to the floor deck AL will overhang floor Secure with 2 3 screws 120 3 4 306 7 cm IMPORTANT MEASUREMENT Floor Width Flush Flush 2 3 7 6 cm Screws 120 304 8 cm There will be an overhan...

Страница 15: ...ucted Secure the gusset to the rafters with 12 2 nails in the pattern shown Fig B Place 2 rafters ECN in the jig as shown Hold ECN firm against outside AL s as shown Fig A and push rafters tight to the middle AL Rafters should touch at tips Fig B FINISH Place two rafter halves ECN in the jig as shown STEP 1 Flush rafters at peak Secure gusset to rafters with 2 nails following the pattern shown FIg...

Страница 16: ...e 1 AM and OSB end to end on flat surface flush in middle Center OSB on top of AM Fasten together with 3 nails in the pattern shown Your door header is now assembled FINISH OSB ASSEMBLED END VIEW BEGIN 1 AM AM 2 Flip header assembly over and nail as shown on the other side Flush Flush Assemble this door header before building any walls ...

Страница 17: ...lling one panel and squaring frame Move to the opposite end Using the long edge of the panel as a lever move the panel side to side until you have a 3 4 measurement on the wall stud Secure corner with 2 2 nails Fig B 3 4 Gauge Block x1 3 8 x 48 x 84 1 x 121 9 x 213 4 cm For squareness maintain 3 4 and 1 1 2 measurement along panel edge BEGIN HERE 3 4 1 9 cm 6 15 2 cm 12 30 5 cm 2x3 TEMP SPACER 3 4...

Страница 18: ... x1 SL RR YFA YFA TO RR SL AI x6 UY x3 Flush Flush Flush Flush Flush Flush Seam 3 7 6 cm Screws Orient parts on edge on floor as shown Measure and mark from end of boards Orient Pre Assembled Header on flat side Fig A Secure with 2 3 nails at each connection and 4 3 nails at seams Fasten 3 middle parts UY to Pre Assembled Header with 2 3 screws Fig B Secure parts UY to top plates with 2 3 nails at...

Страница 19: ...with 2 3 screws Secure panels with 2 nails spaced 6 apart on edges 2x3 2x3 2x3 PARTS REQUIRED 2 5 1 cm x150 x1 x1 6 15 2 cm 1 1 2 3 8 cm BEGIN HERE 3 4 1 9 cm Flush Flush OO Temporary Brace 3 7 6 cm x2 4 3 64 162 6 cm 3 7 6 cm Screw 3 7 6 cm Screw 3 4 1 9 cm x1 69 75 3 cm Door Stiffener OO Temporary Brace Install 2 11 7 8 x 84 panels flush to installed panels and 1 1 2 from the top plate Secure pa...

Страница 20: ...E WALL OPTION 3 DOOR LOCATION RIGHT SIDE OF EAVE WALL IF YOU CHOOSE TO LOCATE THE DOOR TOWARD THE RIGHT GO TO Page 22 TO BEGIN BUILDING YOUR WALL IF YOU CHOOSE TO LOCATE THE DOOR CENTERED GO TO Page 25 TO BEGIN BUILDING YOUR WALL IF YOU CHOOSE TO LOCATE THE DOOR TOWARD THE LEFT GO TO Page 19 TO BEGIN BUILDING YOUR WALL EAVE WALL GABLE WALL DOUBLE DOORS GABLE WALL DOUBLE DOORS ...

Страница 21: ...57 1 cm AO x1 2 x 4 x 35 5 1 x 10 2 x 88 9 cm QT BEGIN 1 x7 2 x 4 x 78 1 2 5 1 x 10 2 x 199 4 cm AI x1 2 x 4 x 44 3 8 5 1 x 10 2 x 112 7 cm HVC x1 2 x 4 x 92 5 8 5 1 x 10 2 x 235 3 cm TJ Orient parts on edge on floor as shown Measure and mark from end of boards Secure with 2 3 nails at each connection and 4 3 nails at seams Seam SEAM 3 7 6 cm Nails 35 88 9 cm Seam x2 2 x 4 x 68 1 2 5 1 x 10 2 x 17...

Страница 22: ...mark QT AO AO x1 2 x 4 x 78 1 2 5 1 x 10 2 x 199 4 cm AI HINT For easier nailing stand on frame EAVE SIDE WALL WITH DOOR LEFT x2 2 x 4 x 22 1 2 5 1 x 10 2 x 57 1 cm AO x1 2 x 4 x 35 5 1 x 10 2 x 88 9 cm QT 3 7 6 cm Nails YFA YFA x2 2 x 4 x 68 1 2 5 1 x 10 2 x 174 cm YFA 44 3 8 112 7 cm 44 3 8 112 7 cm 30 76 2 cm 30 76 2 cm ...

Страница 23: ...l 48 x 84 door panel 1 1 2 from the top plate Use a 2x3 spacer for consistent measurement Secure panel with 2 nails spaced 6 apart on edges and 12 inside panel 3 Install 2 48 x 84 window panels flush to installed panels Locate panels 1 1 2 from the top plate Secure with 2 nails spaced 6 apart on edges and 12 apart inside panel 4 x2 Go to page 28 2x4 3 1 2 8 9 cm 6 15 2 cm 12 30 5 cm Flush Flush Fl...

Страница 24: ... 17 8 cm AL x2 2 x 4 x 22 1 2 5 1 x 10 2 x 57 1 cm AO x1 2 x 4 x 35 5 1 x 10 2 x 88 9 cm QT BEGIN 1 x7 2 x 4 x 78 1 2 5 1 x 10 2 x 199 4 cm AI x1 2 x 4 x 44 3 8 5 1 x 10 2 x 112 7 cm HVC x1 2 x 4 x 92 5 8 5 1 x 10 2 x 235 3 cm TJ Orient parts on edge on floor as shown Measure and mark from end of boards Secure with 2 3 nails at each connection and 4 3 nails at seams Seam SEAM 3 7 6 cm Nails 35 88 ...

Страница 25: ... nails at each mark QT AO AO x1 2 x 4 x 78 1 2 5 1 x 10 2 x 199 4 cm AI HINT For easier nailing stand on frame EAVE SIDE WALL WITH DOOR RIGHT x2 2 x 4 x 22 1 2 5 1 x 10 2 x 57 1 cm AO x1 2 x 4 x 35 5 1 x 10 2 x 88 9 cm QT 3 7 6 cm Nails YFA YFA x2 2 x 4 x 68 1 2 5 1 x 10 2 x 174 cm YFA 30 76 2 cm 30 76 2 cm ...

Страница 26: ...ur 12 eave wall is now assembled Carefully flip the wall over FINISH Install 48 x 84 door panel 1 1 2 from the top plate Use a 2x3 spacer for consistent measurement Secure panel with 2 nails spaced 6 apart on edges and 12 inside panel 3 Install 2 48 x 84 window panels flush to installed panels Locate panels 1 1 2 from the top plate Secure with 2 nails spaced 6 apart on edges and 12 apart inside pa...

Страница 27: ...5 5 1 x 10 2 x 88 9 cm QT x6 2 x 4 x 78 1 2 5 1 x 10 2 x 199 4 cm AI x1 2 x 4 x 92 5 8 5 1 x 10 2 x 235 3 cm TJ YFA YFA TJ HVC AI x6 QT AO AO AL AL AL Orient parts on edge on floor as shown Measure and mark from end of boards Secure with 2 3 nails at each connection and 4 3 nails at seam 3 7 6 cm Nails 35 88 9 cm Seam x2 2 x 4 x 68 1 2 5 1 x 10 2 x 174 cm YFA x1 2 x 4 x 44 3 8 5 1 x 10 2 x 112 7 c...

Страница 28: ... on edge on floor as shown Measure and mark Secure with 2 3 nails at each mark and 4 3 nails at seam x2 2 x 4 x 78 1 2 5 1 x 10 2 x 199 4 cm AI x2 2 x 4 x 22 1 2 5 1 x 10 2 x 57 1 cm AO x1 2 x 4 x 35 5 1 x 10 2 x 88 9 cm QT x2 2 x 4 x 68 1 2 5 1 x 10 2 x 174 cm YFA AI QT AO AO Seam SEAM AI YFA YFA 30 76 2 cm 30 76 2 cm ...

Страница 29: ... x1 Your 12 eave wall is now assembled Carefully flip the wall over FINISH Install 48 x 84 door panel 1 1 2 from the top plate Use a 2x3 spacer for consistent measurement Secure panel with 2 nails spaced 6 apart on edges and 12 inside panel 3 Install 2 48 x 84 window panels flush to installed panels Locate panels 1 1 2 from the top plate Secure with 2 nails spaced 6 apart on edges and 12 apart ins...

Страница 30: ... REQUIRED HINT For easier nailing stand on frame x24 3 7 6 cm BEGIN 1 Orient parts on edge on floor Measure and mark Secure with 2 3 nails at each mark and 4 3 nails at seams x5 2 x 4 x 78 1 2 5 1 x 10 2 x 199 4 cm AI x1 2 x 4 x 44 3 8 5 1 x 10 2 x 112 7 cm HVC x1 2 x 4 x 92 5 8 5 1 x 10 2 x 235 3 cm TJ TJ HVC YFA 3 7 6 cm Nails Seam AI x5 x2 2 x 4 x 68 1 2 5 1 x 10 2 x 174 cm YFA SEAM YFA ...

Страница 31: ... x 84 panel 1 1 2 from the top plate Use a 2x3 spacer for consistent measurement Secure panel with 2 nails spaced 6 apart on edges and 12 inside panel 2 Install 2 48 x 84 panels flush to installed panels Locate panels 1 1 2 from the top plate Secure with 2 nails spaced 6 apart on edges and 12 apart inside panel 3 48 x 84 121 9 x 213 4 cm x3 2x3 2x3 3 1 2 8 9 cm 6 15 2 cm 12 30 5 cm 1 1 2 3 8 cm Fl...

Страница 32: ... 243 8 cm TP 24 61 cm 24 61 cm 24 61 cm 1 1 2 3 8 cm 72 182 9 cm 96 234 8 cm 120 304 8 cm 96 234 8 cm 78 1 2 199 4 cm RL TP RL TP AI x6 48 121 9 cm 1 BEGIN Orient parts on edge on floor as shown Measure and mark from end of boards Secure with 2 3 nails at each connection and 4 3 nails at seams 3 7 6 cm Nails Seam Seam Seam HINT Flush Flush Flush Flush ...

Страница 33: ... Install 48 x 84 panel 1 1 2 from the top plate Use a 2x3 spacer for consistent measurement Secure panel with 2 nails spaced 6 apart on edges and 12 inside panel 2 Install 1 23 7 8 x 84 panel and next 48 x 84 panel flush to installed panels Locate panels 1 1 2 from the top plate Secure with 2 nails spaced 6 apart on edges and 12 apart inside panel 3 23 7 8 x 84 60 6 x 213 4 cm x1 1 1 2 3 8 cm 1 1 ...

Страница 34: ...Fig A IMPORTANT Determine the gable end wall you want your double doors on now 1 1 2 3 8 cm Center 12 wall on the 144 365 8 cm floor dimension 1 1 2 3 8 cm overlap is to the top Use OO as a temporary brace Secure with 2 3 screws Your 12 eave wall is now standing FINISH 2 5 1 cm Nails 6 15 2 cm 3 4 Secure lower edge of panels to floor frame with 2 nails spaced 6 apart Angle nails into floor frame F...

Страница 35: ...e end 2 BEGIN Place 10 gable wall centered on floor 1 1 2 3 8 cm overlap is to the top Secure wall with 1 2 screw through the eave wall panel into 8 wall bottom plate Fig A and top plate Fig B Secure wall to bottom plate first 1 Nail lower edge of panels to floor with 2 nails spaced 6 apart Angle nails into floor frame Fig C Nail 12 wall panel to 10 gable wall stud with 1 1 2 nails spaced 6 apart ...

Страница 36: ...plate Fig A and top plate Fig B Secure wall to bottom plate first ENSURE PANEL CORNERS ARE FLUSH 1 1 2 3 8 cm 6 15 2 cm Nail lower edge of panels to floor with 2 nails spaced 6 apart Angle nails into floor frame Fig C 2 5 1 cm Screw 2 5 1 cm Screw Secure 10 wall panel to 12 wall stud with 1 1 2 nails spaced 6 apart Secure wall bottom plates to floor with 3 nails Secure wall top plate with 1 3 scre...

Страница 37: ... bottom plates to floor with 3 nails Secure wall top plates with 1 3 screw at both corners angled as shown Fig D 3 4 1 1 2 3 8 cm Nails 3 7 6 cm Screw Place 10 gable wall on floor centered between installed walls Secure wall with 1 2 screw through the eave wall panel into 8 wall bottom plate Fig A and top plate Fig B Secure wall to bottom plate first BEGIN 1 Flush Flush Flush ENSURE PANEL CORNERS ...

Страница 38: ...rews at each corner Fig B Fig B 3 7 6 cm Screws Fig A x4 2 x 4 x 96 5 1 x 10 2 x 243 8 cm TP DOUBLE DOOR Ensure doubler seams are non aligned over seams of wall top plates SP SP TP TP 3 7 6 cm Nails JBD TJ JBD TJ Nail TYP 24 61 cm Your wall doublers are now installed FINISH 3 7 6 cm x8 x2 2 x 4 x 48 5 1 x 10 2 x 121 9 cm SP x2 2 x 4 x 20 3 8 5 1 x 10 2 x 51 8 cm JBD x2 2 x 4 x 92 5 8 5 1 x 10 2 x ...

Страница 39: ... panels on UV flush to installed center panel Secure with 1 1 2 nails as shown 1 BEGIN 2 Repeat steps to build the 2nd gable assembly Your 2 gable assemblies are completed FINISH Flush Flush x16 1 1 2 3 8 cm GABLE PANELS PARTS REQUIRED Install all panels with the primed side facing up Build 2 gable panel assemblies x4 2 x 4 x 23 1 4 5 1 x 10 2 x 59 1 cm UV x2 x2 x2 ...

Страница 40: ...x 4 7 8 5 1 x 10 2 x 12 4 cm CLA 3 7 6 cm x56 x4 Fig A Fig D Flush Flush Flush Flush Flush 3 7 6 cm Screws Fig C Flip over gable frame sub assembly and attach ECA to 3 CLA with 3 screws Fig C Repeat steps to build 3 additional gable frame sub assemblies Repeat STEP 3 to assemble the 2nd gable overhang frame To complete gable gable overhang frame join 2 sub assemblies together wth 3 screws angled a...

Страница 41: ...cure with 1 5 8 screws as shown Fig E 4 Arrange gable and ladder assemblies as shown Fig E You will build 2 gable units Fig E x2 Gable Assemblies Flush Flush Flush 1 5 8 4 1 cm Screws Repeat STEP 4 to build the 2nd gable unit x2 Overhang Frames FINISH You have finished building 2 gable units x52 1 5 8 4 1 cm Primed side down ...

Страница 42: ...aligned over studs as shown Secure with 3 screws Secure rafter to top plate with 2 3 screws above notch Fig B Fig C Your rafters are now installed 3 BEGIN 1 Locate first rafter on top plate Fig A aligned over studs at each side and tight to side wall Fig B Fig C Rest notch on top plate 2 BEGIN HERE Fig C Tight to side wall 2 3 7 6 cm Screws Fig B 2 3 7 6 cm Screws Tight to side wall Fig A Flush to...

Страница 43: ...into wall doubler Secure with 2 nails spaced 6 apart as shown Your gable units are now installed FINISH 2 5 1 cm x46 3 7 6 cm Screws NAIL FIRST 2 5 1 cm NAIL FIRST 2 5 1 cm 6 15 2 cm Fig A WALL DOUBLER 1 1 2 3 8 cm Measure and Mark 1 1 2 3 8 cm Measure and Mark Working inside secure gable unit with 3 screws into UV and doubler at an angle as shown Fig B Secure gable unit framing to end rafter with...

Страница 44: ...panel with 2 nails in the corners Note Install all roof panels with the rough side up painted grid lines 48 x 96 3 4 1 9 cm Fig A Gauge Block Move Gable 2 nail in each corner 2 nail in each corner Move to the opposite end Using the long edge of the panel as a lever move the panel side to side until the corner is flush to the rafter end Fig B Move gable end rafter edge until it is 1 2 from the pane...

Страница 45: ...lever move the panel side to side until the corner is flush to the rafter end Fig B Move gable end rafter edge until it is 1 2 from the panel Fig C Secure panel with 2 nails in the corners Install 1 27 1 4 x 47 7 8 roof panel flush to the installed panel and flush to the rafter end Fig B Secure panel with 1 2 nail in each corner 3 Flush Flush at rafter ends Fig B Fig C 1 2 1 2 cm 7 16 x 27 1 4 x 4...

Страница 46: ... the panels Fig C Secure the panels with 2 nails in each corner 5 6 7 Fig D Maintain spacing between the center of the rafters for the lower panels Fig D Secure panels with 1 2 nail into the rafters as shown Move to the top panels and keep spacing between the center of the rafters Secure panels with 1 2 nail into the rafters NOTE Measurements from inside of gable panels 2 5 1 cm x26 3 4 GAUGE BLOC...

Страница 47: ...l with 2 nails in each corner 8 8 1 2 x 27 1 4 8 1 2 x 27 1 4 8 1 2 x 48 8 1 2 x 48 Your roof panels are now installed FINISH Repeat all steps to install roof panels on the opposite side PARTS REQUIRED ROOF PANELS Secure roof panels with 2 nails spaced 6 apart on edges and 12 apart inside panel 9 7 16 x 48 x 8 1 2 1 1 x 121 9 x 21 6 cm x2 7 16 x 27 1 4 x 8 1 2 1 1 x 69 2 x 21 6 cm x2 2 5 1 cm x268...

Страница 48: ... A and faligned to gable unit seam Fig B Secure with 2 finishing nails spaced approximately 8 apart Repeat steps to install soffit boards on the opposite side gable x80 2 5 1 cm 1 BEGIN Your gable soffit panels are now installed FINISH Fig B Flush to wall Fig A 8 20 3 cm 2 5 1 cm Finishing Nails Flush at center seam x4 3 8 x 7 7 8 x 73 5 16 1 x 20 x 186 2 cm ...

Страница 49: ...ishing nails 2 nails in each rafter and 4 nails angled at the seam Fig C Repeat steps to install eave side soffit boards on the opposite side x32 2 5 1 cm 1 BEGIN Your eave side soffit panels are now installed FINISH Fig A 2 5 1 cm Finishing Nails x8 per board Flush Fig B Fig C Flush Flush SEAM x4 3 8 x 5 7 8 x 73 1 x 14 9 x 185 3 cm Eave soffit may need to be trimmed to fit ...

Страница 50: ...the other gable end Your gable fascia boards are now installed FINISH 1 BEGIN PARTS REQUIRED Fig A Fig B Flush Flush at peak SPACED EVENLY Flush with top of OSB roof panels 2 5 1 cm Finishing Nails Hint Pre set nails in fascia before final installation Install all trim panels with primed side facing out x2 3 8 x 4 3 4 x 75 7 8 1 x 12 1 x 192 7 cm x2 3 8 x 4 3 4 x 75 7 8 1 x 12 1 x 192 7 cm ...

Страница 51: ...fter end and 4 nails angled at the seam Repeat steps to install fascia on the opposite eave Your eave side fascia boards are now installed FINISH 1 BEGIN PARTS REQUIRED x4 3 8 x 4 3 4 x 80 7 8 1 x 12 1 x 205 3 cm Flush at middle rafter 2 5 1 cm Finishing Nails Flush with roof panel Fig A Flush Flush Flush SEAM Install all trim panels with primed side facing out Eave fascia may need to be trimmed t...

Страница 52: ...screws in middle and at ends as shown Install temporary support GAA with 2 1 1 4 screws HINT Look for 3 8 SPACER attached to doors OO GAA OFFSET 4 3 7 6 cm Screws Screws 1 1 4 3 cm Bottom edges flush 3 8 1 cm 3 8 1 cm 3 8 1 cm 3 8 1 cm OFFSET GREEN RED 3 7 6 cm OO x1 69 175 3 cm Door Stiffener 3 4 1 9 cm 23 1 2 59 7 cm 23 1 2 59 7 cm 1 1 4 3 2 cm x2 x4 IMPORTANT USE DOORS WITH HINGE BOARD ENDS PAI...

Страница 53: ... Your double doors are now installed Fasten hinge boards to wall supports and floor with 10 3 screws as shown Make sure screws go into framing and floor Fig C D 6 3 7 6 cm Screws into the wall support and floor frame Fig B SEAM Fig C 3 8 1 cm Fig D Angle 3 7 6 cm Screw Install temporary support OO as a ledger board flush under wall panels for doors to rest on Secure with 3 3 screws Fig A 3 7 6 cm ...

Страница 54: ...Your door trim and threshold are now installed FINISH 2 Install upper door trim AH with 4 3 4 screws to doors from inside of doors 4 Install lower door trim AH with 4 3 4 screws as shown BEGIN 1 Center trim ZJ over doors and secure with 5 2 finishing nails into framing Reinforce the door trim with 3 4 screws through door panel into trim Fig A Locate screws as shown Fig B x1 64 Metal Threshold 3 4 ...

Страница 55: ...or Fig A 1 PARTS REQUIRED x12 2 5 1 cm DOUBLE DOOR STIFFENERS GABLE WALL FINISH Repeat steps to install OO on right door Secure with 6 2 screws through outside trim into OO Fig B Fig A Center OO in door opening OO x2 69 175 3 cm Door Stiffener OO x2 1 2 5 cm 1 2 5 cm OFFSET Screws 2 5 1 cm Fig B IT IS IMPORTANT TO HOLD THESE DIMENSIONS 2 5 1 cm Screws x14 ...

Страница 56: ... 1 2 3 8 cm x2 1 2 1 3 cm 1 1 2 3 8 cm 35 3 4 90 8 cm SIDE VIEW INSTALL ON RIGHT DOOR TOP VIEW 1 4 0 6 cm Pre drill and 1 2 1 2 cm Drill through 1 4 0 6 cm 1 2 1 3 cm Drill Bits Your door handle is now installed FINISH 2 Insert shaft in hole and secure handle with 1 1 2 screws Fig B Attach inside handle and secure with set screw as shown x1 x2 1 1 2 3 8 cm PARTS REQUIRED DOUBLE DOOR HARDWARE 1 1 2...

Страница 57: ... open position with bolt ends 3 8 1 cm down from frame Bolt is open when loop is contacting base Fig A Mark and pre drill holes for screws Install bolt with screws supplied and drill 5 16 0 8 cm hole deep enough for bolt to slide into Place bolts onto OO in open position with bolt ends 1 2 1 3 cm up from floor Bolt is open when loop is contacting base Fig B Mark and pre drill holes for screws Inst...

Страница 58: ...R OPENING DIRECTION Right Hand R H or Left Hand L H STOP IF YOU CHOOSE TO HAVE YOUR DOOR SWING OPEN TO THE RIGHT GO TO Page 57 IF YOU CHOOSE TO HAVE YOUR DOOR SWING OPEN TO THE LEFT GO TO Page 61 LEFT HAND DOOR RIGHT HAND DOOR ...

Страница 59: ...rews into the wall support and floor frame Measure Gap Fig B between door trim and wall panel as shown Hold door in position and keep level Hinge board must overhang wall panel at measurement shown Fig C Bottom of door trim is even with wall panel as shown Carefully cut bottom wall frame 2 x 4 flush with door frame using a saw Fig A Be careful not to cut into floor panel 5 8 1 6 cm 5 8 1 6 cm 5 8 ...

Страница 60: ...3 x 157 5 cm AHR AHR INSIDE OF DOOR Your door trim is now installed FINISH BEGIN 1 2 Center trim GEA over door and secure with 4 2 finishing nails into framing as shown Fig C 5 Flush ZJ with bottom of wall panel and door and secure with 5 2 finishing nails into framing as shown Ensure 3 8 measurement as shown Fig C Reinforce the door trim using 3 4 screws through door panel into trim Fig A Locate ...

Страница 61: ...held closed install weatherstrip LRA flush to metal threshold at bottom of door Fig D Hold LRA tight against inside of door Fig D Secure LRA using 2 finishing nails into right door frame as shown 3 Repeat STEP 3 to install LRA on other side of door opening OO x1 69 175 3 cm Door Stiffener 2 5 1 cm Screws x6 14 35 6 cm Approximately 1 2 5 cm 2 5 1 cm Screws Fig B OO IT IS IMPORTANT TO HOLD THIS DIM...

Страница 62: ... 4 dril Pre drill through hole with 1 2 drill Keep drilled hole square to trim to avoid breaking edge of door stiffener Your door handle is now installed BEGIN 1 FINISH 2 Insert shaft in hole and secure handle with 1 1 2 screws Fig B Attach inside handle and secure with set screw as shown x1 x2 1 1 2 3 8 cm TOP VIEW 1 1 2 3 8 cm Go to page 65 1 1 2 3 8 cm Fig A Fig B Set Screw 1 1 2 3 8 cm x2 5 1 ...

Страница 63: ...ng and floor Fig D Fig E 5 Measure Gap Fig B between door trim and wall panel as shown Hold door in position and keep level Hinge board must overhang wall panel at measurement shown Fig C Bottom of door trim is even with wall panel as shown Door Frame Flush Carefully cut bottom wall frame 2 x 4 flush with door frame using a saw Fig A Be careful not to cut into floor panel 5 8 1 0 cm 5 8 1 6 cm 5 8...

Страница 64: ...2 x 2 1 2 x 62 1 5 x 6 3 x 157 5 cm AHR AHR INSIDE OF DOOR BEGIN 1 2 Center trim GEA over door and secure with 4 2 finishing nails into framing as shown Fig C 5 Flush ZJ with bottom of wall panel and door and secure with 5 2 finishing nails into framing as shown Ensure 3 8 measurement as shown Fig C Reinforce the door trim using 3 4 screws through door panel into trim Fig A Locate screws as shown ...

Страница 65: ...or held closed install weatherstrip LRA flush to metal threshold at bottom of door Fig D Hold LRA tight against inside of door Fig D Secure LRA with 2 finishing nails into right door frame as shown 3 Repeat STEP 3 to install LRA on other side of door opening OO x1 69 175 3 cm Door Stiffener 2 5 1 cm Screws x6 14 35 6 cm Approximately 1 2 5 cm 2 Screws 5 1 cm Fig B O O IT IS IMPORTANT TO HOLD THIS ...

Страница 66: ...l Pre drill through hole with 1 2 drill Keep drilled hole square to trim to avoid breaking edge of door stiffener Your door handle is now installed BEGIN 1 Fig B Set Screw 1 1 2 3 8 cm x2 FINISH 2 Insert shaft in hole and secure handle with 1 1 2 screws Fig B Attach inside handle and secure with set screw as shown x1 x2 1 1 2 3 8 cm TOP VIEW 1 1 2 3 8 cm 5 1 2 Shaft Go to next page 1 1 2 3 8 cm Fi...

Страница 67: ... 6 cm x4 3 8 x 1 3 4 x 81 7 8 1 x 4 4 x 208 cm 82 1 2 209 6 cm Fig C Seam is flush Caulk seam before painting trim 82 1 2 209 6 cm Fig B Install gable end 82 1 2 corner trim under gable panel Fig A and flush to eave wall panel Fig B Secure with 2 finishing nails spaced evenly Install eave side 81 7 8 corner trim flush to eave soffit and flush along seam of installed corner trim Fig C Secure with 2...

Страница 68: ...J on 3rd rafters from front and back walls Secure with 2 nails as shown HINT For best appearance install collar ties on rafters facing away from double door opening x12 2 5 1 cm 3rd Rafter 3rd Rafter HJ HJ Flush to roof panel Flush to roof panel 2 5 1 cm Nails LEVEL 1 x 3 x 72 1 6 x 7 6 x 182 9 cm x2 HJ ...

Страница 69: ...high quality exterior grade caulk before installing Fig A 2 WINDOWS AND WINDOW TRIM Mark center of window frame as shown Measure over 11 1 2 and mark Repeat step for other window Repeat steps to install the second window 1 5 8 4 1 cm x8 1 5 8 4 1 cm Screws 11 1 2 29 2 cm 11 1 2 29 2 cm 11 1 2 29 2 cm 11 1 2 29 2 cm Caulk behind frame near edge Fig A ...

Страница 70: ...er trim horizontally on window Secure with 2 finishing nails Nail into window frame and studs behind Repeat to install other ROR 11 1 2 29 2 cm 11 1 2 29 2 cm Fig B 2 finishing nails into wall frame CENTER OF WINDOW CENTER OF WINDOW Place the inside edge of AZ 11 1 2 apart from the center of window as shown Fig B Center trim vertically on window Secure with 2 finishing nails at locations shown Nai...

Страница 71: ... 1 Locate vent in the gable wall as shown Your gable vents are now installed Secure with 4 1 screws x2 GABLE VENTS 15021 Repeat steps to install on the opposite gable wall x8 8 x 1 2 5 cm Pan Head Screws 8 x 1 2 5 cm Pan Head Screws ...

Страница 72: ... Follow directions provided by manufacturer Snip bottom side of drip edge and bend over to other side of roof Follow directions provided by manufacturer PAINT CAULK NOT INCLUDED ROOF FELT NOT INCLUDED DRIP EDGE NOT INCLUDED Install felt flush to all roof edges overlapping 3 Use minimal amount of roofing nails to hold in place OK to overlap at ridge 3 OVERLAP Flush Flush Edge flush to trim Install ...

Страница 73: ...rhang at back and bottom of roof panel Use 4 nails per shingle Starter row must be straight and level all the way across with lower edge of roof deck NOTE If you have installed drip edge install shingles flush to drip edge BEGIN 1 TABS UP Shingle overlaps roof decking 1 2 5 cm overhang past roof deck 1 2 5 cm overhang or flush with drip edge 4 Nails BACK OF SHED FRONT OF SHED NEVER DRIVE FASTENERS...

Страница 74: ...Roof Deck 1 2 5 cm Flush with starter row Flush with starter row Continue installing rows of shingles by staggering at front 4 SHINGLES continued Install second row of shingles flush at top of first row s rain slots Ensure 1 overhang or flush to drip edge at front stagger each row 3 1 2 5 cm 1 2 5 cm FRONT OF SHED FRONT OF SHED Flush with rain slots Flush with rain slots Notch Notch ...

Страница 75: ...at ridge cut to peak with a utility knife Repeat steps 1 5 to shingle the opposite side of your roof Trim shingles at ridge Once both sides are shingled you need to trim ends Strike a chalk line 1 from edge Using your shingle hooked blade carefully cut shingles along chalk line 5 6 7 8 SHINGLES continued If more than 5 to rain slot you must install another row of shingles 5 12 7 cm or less 5 12 7 ...

Страница 76: ... cut off pieces first Score shingle then snap off angled cut Install first ridge cap flush to shingles at front as shown Install second ridge cap 5 back as shown 2 3 BEGIN 1 2 5 cm 2 5 cm 2 5 cm 2 5 cm 2 5 cm 2 5 cm Top of slot Weather Seal Flush 1 Nail per side through weather seal 1 Nail per side through weather seal 5 12 7 cm FRONT OF SHED FRONT OF SHED Flush 33 to 35 Pieces ...

Страница 77: ... 4 between the shingle color and edge of shingles When you have 4 minimum of shingle color cut one piece to cap your roof Install flush to shingles 4 5 6 7 2 Nails per side You have finished your ridge cap FINISH Cut at top of rain slot Flush to shingles Trim cap off flush to shingles Cap 4 10 cm ...

Страница 78: ...nel w Door Cutout 3 8 NG PANEL W DOOR K 8400480000U 1 Center Gable Panel w Hole 3 8 NG 23 7 8 X 34 CENTER K 34002314000 2 Gable Panels RIGHT 3 8 NGx 28 x 48 RT GABLE K 48002800110 2 Gable Panels LEFT 3 8 NGx 28 x 48 LT GABLE K 48002800210 2 Gable Soffit 3 8 NG 7 7 8 X 73 5 16 K 73050714000 4 Eave Soffit 3 8 NGx5 7 8 X 73 K 73000514000 4 Eave Fascia 3 8 NGx4 3 4 X 80 7 8 K 80140412000 4 Gable Trim ...

Страница 79: ...ll sides and all edges of doors Gazebos Pergolas To validate your warranty it is necessary to properly maintain your Backyard Storage Solutions LLC unit This includes treating all of the exposed cedar and pine surfaces on your gazebo or pergola structure with an exterior grade wood preservative an exterior oil based semi transparent stain an acrylic latex exterior paint or an acrylic latex solid c...

Отзывы: