©
HDG Bavaria GmbH 06/2008
HDG Euro V3.0 with HDG Lambda Control 1 - V 1 - en
5 Cleaning and maintaining the HDG Euro – How to proceed
53
2.
Press the
“Reload”
button.
3.
Open the filling hatch (1)
4.
Clamp a sheet of paper (approx. 300 mm long and 20 m wide)
between the contact surface (2) and filling hatch seal.
5.
Close the filling hatch (1).
6.
Pull on the paper.
✓
If the paper moves, the door is not properly sealed.
✓
If the paper does not move, the door is properly sealed.
7.
Repeat the procedure from step 2 to step 5 until you have
inspected all four of the contact surfaces (2).
8.
Remove the paper and close the filling hatch (1).
✓
The inspection of the filling hatch seal is completed.
Inspecting the ash door
1.
Allow the fire in the boiler to burn out.
✎
See section “4.1 Overview of the controls and display
components” in chapter “4 Using the HDG Euro”.
Figure 5/15 - Inspecting the door seals
1
1
2
If the filling hatch does not seal properly, contact a specialist to
have it repaired.
The operating status of the HDG Euro must be indicated with
“
Heat production off
” in the display of the HDG Lambda
Control.
Caution!
Danger of burns from hot surfaces.
The surfaces of the boiler can be hot. Even when turned off, they
only cool down slowly.
Do not start with the maintenance work until the surfaces have
cooled down.
Содержание Euro V3.0
Страница 1: ...hdg bavaria com HDG Euro V3 0 with HDG Lambda Control 1 Operation Manual V 01 06 2008 ...
Страница 2: ......