5 Cleaning and maintaining the HDG Euro – How to proceed
56
HDG Euro V3.0 with HDG Lambda Control 1 - V 1 - en
©
HDG Bavaria GmbH 06/2008
Calibrating the lambda sensor
1.
Allow the fire in the boiler to burn out.
✎
See section “4.1 Overview of the controls and display
components” in chapter “4 Using the HDG Euro”.
2.
Press the
Arrow
button.
✓
The “
Selection/information
” message will appear in the
display.
3.
Press the
Plus
button twice.
✓
The message “
Selection / component test
” appears in
the display.
4.
Press the
Arrow
button.
✓
The message “
Test O
2
sensor
” appears in the display.
5.
Press the
Plus
button.
✓
The calibration of the lambda sensor starts. The runtime is
720
seconds.
✓
When the sensor test is complete, the message “
Sensor okay
”
appears in the display.
✓
The lambda sensor is calibrated.
6.
Press the
Plus
and
Minus
buttons simultaneously.
✓
The system component test menu closes.
The operating status of the HDG Euro must be indicated with
“
Heat production off
” in the display of the HDG Lambda
Control.
No residual embers should be in the fuel chamber!
If the “
Sensor defective
” message appears in the display,
have the fault rectified by a qualified electrician or an authorised
HDG installer.
Содержание Euro V3.0
Страница 1: ...hdg bavaria com HDG Euro V3 0 with HDG Lambda Control 1 Operation Manual V 01 06 2008 ...
Страница 2: ......