-S3 -9
2_4a U901
2-4a
SETTING UP THE MACHINE
6. Loosen the screw with a offset driver and remove the
red shipping collars that are equipped on the both
side of the guide bar. (Keep the shipping collars. It is
necessary when packing.)
7. Put the carriage and carriage arm together with screw
(M4 X 8 2 pcs).
2 pins in the upper carriage arm will fit into holes on
the lower carriage.
8. Remove the fixing screw (M3 1 pcs) that fixing the arm
indicated by the arrow. (Keep the
fixing screw.
It is necessary when packing.)
9. Raise slowly the control box to the front then fix it with
2 supplied screws (M4 1 pcs).
10. Connect the cable of carriage to the machine with
fixed screw.
11. Install the arm for tubular embroidery. Please refer to
(page 6-1) “Installing and removing the frame base”.
Or, Install the cap frame for the cap embroidery.
Please refer to (page 7-1) “Installing and removing the
cap drive frame”.
12. Insert built-in stylus into the holder (slot) of control
box.
When taking the machine apart in case of packing,
the process is opposite of assembling the machine.
Please do exactly the opposite way of assembling.
When packing the machine up for transportation,
be sure to select the sixth needle and fix it with
shipping collars on the both side of the guide bar.
9
6
7
8
10
12
Содержание HCS3
Страница 2: ......
Страница 136: ... D2 117 13 6 FRAME CONFIRMATION 20_5 NB01 11 Press Press to return to Drive mode ...
Страница 263: ... RA 110 26 3 BUILT IN FONT LIST 26_3 P401 Basic script Diacritic script ...
Страница 264: ... RA 111 26 3a BUILT IN FONT LIST 26_3a P401 ...
Страница 265: ... RA 112 26 3b BUILT IN FONT LIST 26_3b P401 Those fonts are created by www i cliqq com Cyrillic script ...
Страница 309: ......
Страница 323: ......
Страница 350: ...HCH HCS HCD HCU ONE TOUCH FRAME 7 1 FOPC01 1 12 13 14 2 6 3 B 11 C 9 4 E A 3 4 D C 8 7 5 10 ...
Страница 363: ......