160/204
Machin - Motion of machine
5-6-2
The machine has following individual actions. As actuators
such as motor etc. may work, please put the machine in
motion to check that there is no problem, then start.
It is dangerous to approach the machine while it is in motion.
Please keep your face and hands off from it in motion.
Machin
A : checking of turning of main shaft
B : Automatic speed Adjustment of main shaft
C : Operation of main shaft with low speed
D : Setting of needle number at right side
E : Setting of needle number at left side
F : Checking of needle number
G : Moving needle selection to right (for 1 needle)
H : Moving needle selection to left (for 1 needle)
I : Individual action of thread catch
J : Individual action of thread cut solenoid
K : Individual action of jump solenoid
L : Individual action of brake solenoid
M : Individual action of keeper solenoid
N : Individual action of pressure foot up
P : Individual action of pressure foot down
Q :
No use
Z :
1. Press “
” button and press “ENT” button with display
of
Machin.
2. Press “
” button to have number(s) to be checked,
then press “ENT” button.
Machine will execute the order.
3. Press “
” button and press “ENT” button with display
of
Ret, mode will return to number you want to check.
4. When you press “ENT” button with display of
End, you
will be off from maintenance mode.
Содержание HCS-1201-30
Страница 1: ...Maintenance Manual for Embroidery Machine HCS 1201 30 Version 3 0 HAPPY Industrial Corporation ...
Страница 12: ...12 204 2 Outer covers 2 1 Removal of outer covers ...
Страница 75: ...75 204 Exchange of thread adjusting spring 3 3 10 E ring Washer 7 Put removed parts back in reverse order ...
Страница 81: ...81 204 3 4 Needle bar change unit 3 4 1 Fixing of needle bar change unit ...
Страница 83: ...83 204 3 5 Rotary hook 3 5 1 Adjustment of rotary hook timing 3 5 2 Adjustment of retainer on rotary hook ...
Страница 124: ...124 204 4 Electricity 4 1 Circuit board related parts 4 2 Sensors ...
Страница 153: ...153 204 5 4 Revolution 5 4 1 Adjustment of revolution ...
Страница 155: ...155 204 5 5 Setting to detect needle position 5 5 1 Setting to detect needle position for 12 needles ...
Страница 164: ...164 204 5 7 Detection of power outage 5 7 1 Adjustment of power outage detection ...
Страница 166: ...166 204 6 Electric documents 6 1 Electric system diagram 6 2 Reference diagram for wiring 6 3 Inverter ...
Страница 167: ...167 204 6 1 Electric system diagram 6 1 1 Electrical connection diagram 6 1 2 List of electrical connection diagrams ...
Страница 168: ...168 204 Electrical connection diagram 6 1 1 ...
Страница 169: ...169 204 List of electrical connection diagrams 6 1 2 ...
Страница 170: ...170 204 6 2 Reference diagram for wiring 6 2 1 Reference diagram for wiring AC Iine ...
Страница 171: ...171 204 Reference diagram for wiring AC Iine 6 2 1 ...
Страница 173: ...173 204 VFNC1 S Connection of inverter and setting of parameter 6 3 1 ...
Страница 174: ...174 204 FR S510W Connection of inverter and setting of parameter 6 3 2 ...
Страница 175: ...175 204 7 Others 7 1 How to respond for some question As example step 7 2 Trouble shooting 7 3 Error 7 4 Reference date ...
Страница 198: ...198 204 7 3 Error 7 3 1 Error and measure ...
Страница 202: ...202 204 7 4 Reference date 7 4 1 Tables for timing adjustment value ...