Strain Gauge
5-7
P/N 108755-US, Manual revision: AA
B
ODY
B
OARD
S
TRAIN
G
AUGE
A
MP
A
DJUSTMENT
P
ROCEDURE
Note: If the body board PCBA and/or the strain gauge was replaced, perform this
procedure.
1.
Reattach strain gauge assembly and shroud onto the Shaker.
2.
Enter the password, press <0> twice. The display should read "manual."
3.
Press the <+> button to initiate the Shaker rocking until the shroud is at
its maximum angle up. Continue to press the <+> button. (This procedure
can also be accomplished by manually moving the link "m" to its highest
position).
Note: For those 10402511 PCBAs at Revision G or higher, go to step 11.
4.
Adjust potentiometer R3 on the body board until the display indicates 55
±3 with no load on the shroud.
5.
Place calibration weight on the shroud with flipper toward the bag pins.
6.
Adjust R7 for 785 ±5 reading.
7.
Remove the calibration weight. Readjust R3 for 50 ±3.
8.
Repeat steps 4 through 7 until within limits.
9.
Press the <#> button twice. The display should read "READY."
10.
Calibrate the Shaker (reference Chapter 3, Calibration on page 3-5). (End
of Procedure PCBAs with Revision F or lower.)
11.
For those 10402511 PCBAs at Revision G or higher, after step 3 connect
junction of resistors 24 and 25 to TP5 on the body board with a jumper
wire.
12.
Adjust R3 until the display indicates 50±3 with no load on the shroud.
13.
Place calibration weight on shroud with counterweight towards the bag
pegs.
14.
Adjust R7 for 850±5 reading.
15.
Repeat steps 12 through 14 until within limits.
16.
Press the <#> button twice. The display should read "ready".
17.
Calibrate the Shaker (reference Chapter 3, Calibration on page 3-5).
Содержание SEBRA 1040
Страница 1: ...108755 US service manual Model 1040 Digital Blood Shaker...
Страница 3: ......
Страница 4: ...Printed in USA Copyright 1999 2010 Haemonetics Corporation...
Страница 8: ...vi Preface P N 108755 US Manual revision AA...
Страница 12: ...x Table of Contents P N 108755 US Manual revision AA...
Страница 14: ...xii List of Figures P N 108755 US Manual revision AA...
Страница 20: ...1 6 Introduction P N 108755 US Manual revision AA...
Страница 36: ...3 10 Inspection Procedures P N 108755 US Manual revision AA...
Страница 37: ...P N 108755 US Manual revision AA Chapter 4 Parts Access BASE PLATE REMOVAL 4 2 SHROUD REMOVAL 4 3...
Страница 40: ...4 4 Parts Access P N 108755 US Manual revision AA...
Страница 48: ...5 8 Strain Gauge P N 108755 US Manual revision AA...
Страница 60: ...7 6 Tube Clamp Assembly P N 108755 US Manual revision AA...
Страница 64: ...8 4 PCB Chassis Assembly Installation P N 108755 US Manual revision AA...
Страница 83: ...P N 108755 US Manual revision AA Chapter 11 Clamp Body Boss Replacement REPLACING THE BODY BOSS 11 2...
Страница 86: ...11 4 Clamp Body Boss Replacement P N 108755 US Manual revision AA...
Страница 98: ...13 8 Cap Assembly P N 108755 US Manual revision AA...
Страница 102: ...14 4 Power Supply P N 108755 US Manual revision AA...
Страница 103: ...P N 108755 US Manual revision AA Chapter 15 Shaker Keystroke Quick Reference KEYSTROKE QUICK REFERENCE 15 2...
Страница 105: ......
Страница 106: ...Haemonetics Corporation 400 Wood Road Braintree MA 02184 USA www haemonetics com 1995 2010 Haemonetics Corporation...