![H3C H3C SECPATH F1000-S Скачать руководство пользователя страница 35](http://html1.mh-extra.com/html/h3c/h3c-secpath-f1000-s/h3c-secpath-f1000-s_installation-manual_3117759035.webp)
Installation Manual
H3C SecPath F1000-S Firewall
Chapter 4 Booting and Configuration
4-4
Figure 4-5
Select emulation type
4.1.2 Powering up the Firewall
I. Checking before power-up
Before powering up the firewall, check that
z
Both the power cord and the grounding wire are correctly connected.
z
Proper power supply is used.
z
The console cable is correctly connected.
z
The console terminal (or PC) has been started and the related parameters have
been set on it.
Caution:
Locate the emergency power-off switch in the room before powering up the firewall.
Then, if an accident occurs, you can quickly shut off the power.