12-2
Figure12-1 Removing the grounding cable
Repackaging the router accessories
Removing cable management brackets
1.
Prepare the packing bag of the cable management brackets. Make sure the bag is clean, dry,
and not damaged.
2.
Use a screwdriver to loosen the screws that attach the cable management brackets to the
chassis, and then remove the cable management brackets.
3.
Put the cable management brackets into the bag.
Содержание CR16000-M
Страница 32: ...3 3 Figure3 2 Mounting the chassis on the slide rails 4 Attach the chassis to the rack with mounting screws...
Страница 75: ...9 6 Brief issue description Brief introduction of the troubleshooting procedures that have been taken...
Страница 88: ...12 FigureA 14 Example of a device label...
Страница 108: ...19 FigureB 35 Routing AC power cords...
Страница 116: ...12 6 Figure12 5 Repackaging the chassis...