4-4
4.
As shown by callout 2 in
, orient the switching fabric module with the side that has the
"TOP " sign facing upward, align the module with the target switching fabric module slot, and
then insert it into the slot along the guide rails until the ejector levers engages the slot edges.
5.
As shown by callout 3 in
, close the ejector levers until the front panel of the switching
fabric module is flush with the slot.
6.
As shown by callout 4 in
, use a Phillips screwdriver to fasten the captive screws on
the switching fabric module.
Figure4-5 Installing a switching fabric module
Installing the cable management brackets
1.
Unpack the cable management brackets from the accessory box.
2.
Place a cable management bracket against the mounting bracket with the screw on the cable
management bracket aligned with the screw hole in the mounting bracket.
3.
Use a screwdriver to fasten the screw.
Содержание CR16000-M
Страница 32: ...3 3 Figure3 2 Mounting the chassis on the slide rails 4 Attach the chassis to the rack with mounting screws...
Страница 75: ...9 6 Brief issue description Brief introduction of the troubleshooting procedures that have been taken...
Страница 88: ...12 FigureA 14 Example of a device label...
Страница 108: ...19 FigureB 35 Routing AC power cords...
Страница 116: ...12 6 Figure12 5 Repackaging the chassis...