
Tube Section – Assembly
1. Center the connecting band (B) over the tube section (A) connections.
2. Position the connecting band (B) with the joint to the side of the tube (A).
3. Position the joint of the connecting band (B) so that the overhanging lip will shed water and not direct
it to the tube (A).
4. Install the bolts (C) and nuts (D) on each connecting band.
Figure 4-2
Tube section assembly
A
Tube section
C
3/8 x 1-1/2 in. hex bolt
B
Connecting band
D
3/8 nut
5. Repeat steps 1 to 4 for the other tube sections.
6. Locate an area on open level ground accessible to chain hoist or other lifting devices where the Ver-
saLoop™ assembly can be laid out full length.
7. Position the tube supports (E) at regular intervals (every 10 ft. on center) on the open level ground.
8. Position the bottom tube section (A) onto the tube supports (E).
9. Position the clamps (F) to the bottom of the tube (A) and tube supports (E).
10.Install bolts (G) and nuts (H) per each tube support (E) and clamp (F).
11.Repeat this procedure for securing the upper tube (I) section.
Pneg-1966
VersaLoop™
19
Содержание VersaLoop
Страница 1: ...VersaLoop Models Owner s Manual PNEG 1966 Version 1 0 Date 11 05 14 PNEG 1966...
Страница 2: ...2 Pneg 1966 VersaLoop...
Страница 4: ...NOTES 4 Pneg 1966 VersaLoop...
Страница 14: ...NOTES 14 Pneg 1966 VersaLoop...
Страница 26: ...NOTES 26 Pneg 1966 VersaLoop...
Страница 32: ...NOTES 32 Pneg 1966 VersaLoop...
Страница 50: ...NOTES 50 Pneg 1966 VersaLoop...