Start-up
28 | 80
B
A
_
T
D3
-B
S
0
0
1
e
n
_
0
1
4
_
so
ft
liQ
-SD
9.
Open the raw water shut-off valve.
10.
Open the soft water shut-off valve.
Water flows through the flushing water hose to the drain. This is normal
during start-up.
11.
Start the ventilation program.
» There is an automatic sequence of 9 program steps.
» This is followed by a 5-step functional check.
Содержание softliQ:SD Series
Страница 1: ...We understand water Water softener softliQ SD Operation manual ...
Страница 79: ......