Operation
47 | 76
7.2
Starting a manual regeneration
Status level>Menu level>Manual regeneration
A manual regeneration is necessary in the following cases:
● The product resumes operation after a longer period of standstill.
● After maintenance and repair work was performed.
● If the raw water hardness has changed or has been altered.
● After a longer power failure.
Manual regenerations are always full regenerations of both sections in succession.
7.3
Settings
Status level>Menu level>Settings
You can change the following values:
Menu item
Setting options
Change language
German (factory-setting)
English
French
Italian
Change hardness unit
°dH (factory-setting)
°f
°e
ppm
mol/m³
Date, time
Set the time
Current date
Automatic switch-over from DST to ST
Configure Wi-Fi
Refer to chapter 4.8
Select regeneration time
Automatic (factory-setting)
Fixed
Display behaviour on standby
Activated
Deactivated (factory-setting)
Set maintenance interval
730 days (factory-setting)
Содержание softliQ:PA
Страница 1: ...We understand water Water softener softliQ PA Operation manual...
Страница 75: ......