Commissioning
43 | 76
No.
Description
No.
Description
1
Shut-off valve for raw water
2
Shut-off valve hygienically treated soft water
3
Sampling valve for raw water
4
Sampling valve for soft water
9.
Open the raw water shut-off valve at the connection block.
10.
Confirm with ▼.
11.
Look for leaks.
12.
Confirm with ▼.
Water flows through the flushing water hose to the drain. This is completely
normal during commissioning.
13.
Press ENTER to start the deaeration program.
» The display indicates "Remaining time 22:00 min". The counter counts down to
00:00 min. If this is completed, the next display message will be indicated.