
-18-
Model G0806/G0807 (Mfd. Since 12/15)
7. Turn the dial on the overload relay to 19.5A
for 110V (see
Figure 16).
8. Remove six screws securing the grinding and
welding control panel to access grinding unit
wiring.
10. Close and secure the electrical cabinet, re-
install control panel, and secure the motor
junction box.
11. Install an L5-30 plug according to manufac-
turer's instructions.
1
2
3
4
5
T
Figure 17. Welding transformer rewired for
110V.
Wires Reconnected
Terminals #2 & #3
Figure 16. Model G0807 overload relay set to
19.5A.
2T1
6T3
4T2
2T1
6T3
4T2
1L1
5L3
13NO
3L2
97 NO
98 NO
95 NC
96 NC
A1
A2
A2
CU-18
240V
TECO Relay
RHU-17.5-21.5
19
18
17.5
TRIP IND.
TEST RCA
21NC
22NC
14NO
R
O
13NO
21NC
14NO
21.5 A
97NO
96NO
98NO
95NC
3
2
1
1
2
3
4
5
6
7
8
9
10
11
12
1
U
U
1
W
W
4
4
4
2
3
3
4
R
T
3
GND
0V
110V
220V
TRANSFORMER
Ya Chang
Model: S-034-005-1
110V 1-Ph 50/60Hz
6
6
2
R
T
R
T
4
3
1
1
1
Contactor
TECO
110V
0V
2
Primary Voltage:
0V/110V/220V
20
2
2
1
R
R
T
T
T
R
6
6
T
2
2
1
R
R
Ground
19.5A
Relay
Setting
9. Remove the wire connected to the #4 termi-
nal on the welding transformer, and move it to
the #2 terminal; remove the wire connected
to the #5 terminal, and move it to the #3 ter-
minal (see
Figure 17). The machine is now
wired for 110V.
Содержание G0806
Страница 80: ......