
-16-
Model G0806/G0807 (Mfd. Since 12/15)
8. Remove the six screws securing the grinding
and welding control panel to access grinding
unit wiring.
7. Turn the dial on the new overload relay to
7.2A for 220V (see
Figure 11).
4
3
2
1
1
2
3
4
5
6
7
8
9
10
11
12
1
2
1
4
R
T
3
ELECTRICAL PANEL
E
GND
GND
1
2
6
6
1
U
W
1
2
TRANSFORMER
Ya Chang
Model: S-034-005-1
110V 1-Ph 50/60Hz
0V
110V
220V
2T1
6T3
4T2
2T1
6T3
4T2
1L1
5L3
13NO
3L2
97 NO
98 NO
95 NC
96 NC
A1
A2
A2
CU-18
240V
TECO Relay
RHU-10/1 7.2-10A
9
8
7.2
TRIP IND.
TEST RCA
21NC
22NC
14NO
R
O
13NO
21NC
14NO
10A
97NO
96NO
98NO
95NC
U
U
W
W
4
4
4
3
R
T
Contactor
TECO
2
1
T
2
2
T
T
T
R
R
R
0V
110V
R
2
1
Primary Voltage:
0V/110V/220V
Figure 11. Model G0806 overload relay set to
7.2A.
7.2A
Relay
Setting
10. Close and secure the electrical cabinet, re-
install control panel, and secure the motor
junction box.
11. Install a 6-15 plug according to manufac-
turer's instructions.
1
2
3
4
5
6
7
T
Figure 12. Welding transformer rewired for
220V.
Wires Reconnected
Terminals #5 & #7
9. Remove the wire connected to the #4 termi-
nal on the welding transformer and move it to
the #7 terminal; remove the wire connected
to the #2 terminal and move it to the #5 ter-
minal (see
Figure 12). The machine is now
wired for 220V.
Содержание G0806
Страница 80: ......