background image

WA 

 

 

OPTIONAL LIMITED WARRANTY FOR NEW GREENWOOD 

CLEAN ENERGY RESIDENTIAL HEATING EQUIPMENT 

(Covered Equipment: Frontier Series, Model CX, Serial Numbers beginning with GFCXA)

General Provisions 

The Limited Warranty described below is provided by Greenwood 
Clean Energy, Inc. (“Greenwood”) to the original purchasers of new 
Greenwood Frontier Series hydronic furnaces (referred to herein as 
“Boiler”) from Greenwood or an authorized Greenwood dealer.  

The 

completed Warranty Registration Form and a copy of the original 
bill of sale must be signed by the purchaser and mailed or 
delivered to Greenwood within 30 days of purchase in order to 
activate this optional Limited Warranty.

 Under this Limited 

Warranty, Greenwood will, through its authorized dealers, repair or 
replace, at its option, any Greenwood-manufactured part which is 
found to be defective in material or workmanship during the applicable 
warranty period.  Warranty service must be performed by a dealer or 
service partner authorized by Greenwood to service the Boiler 
involved, which will use only new or remanufactured parts or 
components furnished by Greenwood. 

 

Purchaser Responsibility 

It is the purchaser’s responsibility to maintain the Boiler in accordance 
with the instructions provided in the Owner’s Manual. Greenwood 
recommends that purchaser retain records and receipts. Purchaser 
may be asked to provide documentation that Greenwood’s 
maintenance instructions have been followed. 

 

In addition, purchaser’s responsibilities include operating the Boiler in 
a safe manner, and for the purpose for which it was designed.  If a 
defect in materials or workmanship occurs, it is purchaser’s 
responsibility to cease operating the Boiler until repairs may be made.  
Damage which occurs from continued operation after purchaser has 
noted a potential defect in or problem with the equipment is not 
covered by this Limited Warranty.  Purchaser should contact its 
authorized Greenwood dealer immediately so that repairs can be 
made in a timely manner. 

 

In addition, to be eligible for warranty coverage, purchaser’s 
responsibilities include: 

 Ensuring that all installation and commissioning checklists 

shipped with the Boiler and included in the Owner’s Manual are 
completed and submitted to Greenwood. 

 Ensuring that Boiler water is treated and maintained in 

accordance with the instructions and specifications described in 
the Owner’s Manual. 

  Paying for freight costs incurred in returning a defective Boiler or 

component part(s) to the point of original purchase. 

  Submitting to Greenwood a Warranty Registration Form and a 

copy of the original bill of sale within 30 days of purchase. 

 

What This Limited Warranty Covers 

All Greenwood manufactured parts (including refractory and control 
boards) for any new Boiler are warranted for the number of years 
specified below from the verifiable date of purchase. Greenwood will 
pay for replacement parts as noted below and for ground shipment 
thereof to the local authorized dealer.  If the equipment was 
purchased directly from Greenwood, Greenwood will pay for 
replacement parts as noted above and ground shipment to the 
original shipping address. 

 

All parts not manufactured by Greenwood, including but not limited to 
insulation, electrical and control components are warranted by 
Greenwood for one year from the verifiable date of purchase of the 
Boiler. 

 

Purchaser is responsible for all labor costs necessary to replace any 
of these parts and components. 

 

Table 1:

  

Percentage of amount paid by Greenwood based on 

time since year of purchase. 

Product 

Yr 1  Yr 2  Yr 3  Yr 4  Yr 5  Yr 6

Yr 7 

Frontier 

Series 

100% 75% 60% 40% 25% 15%

10% 

 
The installation of replacements parts or components under the terms 
of this Limited Warranty does not extend the original warranty period. 

 
What This Limited Warranty Does Not Cover 

Greenwood does not warrant: 
1. Any and all labor, lodging and transportation charges incurred by 
any person in connection with the examination or replacement of 
parts claimed by the purchaser to be defective. Such costs may be 
covered by a separate warranty provided by the installer. 
2. Any electricity or fuel costs, or increases in electricity or fuel costs, 
for any reason whatsoever. 
3. A Boiler repaired or altered without prior written approval of 
Greenwood. 
4. Any damages, malfunctions or failures resulting from: 

a. Over-firing the Boiler or use of any fuel other than that specified 
in the Owner’s Manual. 
b. Improper installation of or failure to maintain and operate a Boiler 
in accordance with the printed instructions that accompany the 
Boiler

 

or failure to install the Boiler in accordance with applicable 

building codes and ordinances. 
c. Failure of components that are not defective, but must be 
replaced during the Limited Warranty period as a result of wear and 
tear or maintenance.  These include but are not limited to door and 
threshold refractory, insulation, gaskets, and electrical components.   
d. 

Improper maintenance, damage, misuse, abuse, accident, 

negligence, freezing, flood, fire, wind, lightning or Acts of God. 
e. The lack of Boiler low-temperature protection. 
f. Hard water scale buildup inside the heat exchanger tubes and 
manifold. 

5. Any Boiler, part or component purchased from an unauthorized 
dealer or any online seller other than Greenwood. 
6. A Boiler installed outside the United States, Canada or New 
Zealand, without prior approval from Greenwood. 
7. A Boiler that is moved from its original installation site. 
8. A Boiler installed, repaired or otherwise modified by persons other 
than a Greenwood-trained or certified installer or technician. 
 

Disclaimer of Implied Warranties and Limitation of Remedies  

Neither Greenwood nor any company affiliated with or related to 
Greenwood makes any implied warranties, representations or 
promises of any kind as to the quality, performance or absence of 
defect of a Boiler covered by this Limited Warranty.   

 

GREENWOOD MAKES NO IMPLIED WARRANTIES OF 
MERCHANTABILITY OR OF FITNESS FOR A PARTICULAR 
PURPOSE, AND SUCH IMPLIED WARRANTIES ARE SPECIFICALLY 
EXCLUDED. PURCHASER’S REMEDIES IN CONNECTION WITH 
ANY PURCHASED BOILER ARE SET FORTH ON TABLE 1 ABOVE.  
IN NO EVENT WILL THE DEALER, GREENWOOD OR ANY 
COMPANY AFFILIATED WITH OR RELATED TO GREENWOOD BE 
LIABLE TO PURCHASER OR TO ANY OTHER PARTY FOR 
INCIDENTAL OR CONSEQUENTIAL DAMAGES.   

 

Greenwood makes no warranties, either express or 
implied, other than the Limited Warranties stated herein. 

 
Limited Warranty Claim Procedure 

When parts are required under this Limited Warranty, purchaser must 
furnish Greenwood with a completed Warranty Request Form which 
includes the following information: 
1. The complete model and serial number of the Boiler. 
2. Proof of purchaser’s required periodic maintenance, the installation 
date of the Boiler and the location of its original installation. 
3. An accurate description of the problem with the Boiler; and 
4. Contact the nearest Greenwood dealer.  If the dealer is unable to 
provide parts under this Limited Warranty, refer to Greenwood’s 
website 

www.GreenwoodUSA.com

 to locate a dealer, or contact: 

 

Greenwood Clean Energy, Inc. 
13429 SE 30th Street, Suite A 
Bellevue, WA 98005 
(888) 788-3090 
(888) 788-3033 

(fax)

 

1209.01

Содержание Frontier CX

Страница 1: ......

Страница 2: ...ation SAVE THESE INSTRUCTIONS READ THIS MANUAL AND KEEP IT NEAR THE FURNACE FOR REFERENCE V 1 9 2013 Greenwood Clean Energy Inc All Rights Reserved For the latest information about your Greenwood Fron...

Страница 3: ...This page intentionally left blank...

Страница 4: ......

Страница 5: ...enwood Frontier CX Component Identification 11 11 INSTALLATION PREPARATION 12 Installation Requirements Checklist 12 1 Unpack and Inspect the Furnace 13 2 Unload the Furnace 14 3 Locate the Furnace 15...

Страница 6: ...al Power Supply 33 Auto start Generator 33 Auxiliary Wiring for On Demand Zones 33 Auxiliary Wiring for Heat from a Backup Furnace or Boiler 34 OPERATING THE FRONTIER CX 35 Control System 35 Safe Prac...

Страница 7: ..._ ___ ___ ___ ___ To identify your serial number see nameplate location on page 5 Dealer Name ____________________________________________________________ Address _____________________________________...

Страница 8: ...SAFETY Page 4 2013 Greenwood Clean Energy Inc All Rights Reserved V1 9 SAFETY WARNINGS LABEL...

Страница 9: ...SAFETY 2013 Greenwood Clean Energy Inc All Rights Reserved V1 9 Page 5 LABEL LOCATIONS...

Страница 10: ...SAFETY Page 6 2013 Greenwood Clean Energy Inc All Rights Reserved V1 9 This page intentionally left blank...

Страница 11: ...be familiar with local building codes fire codes and other regulations 2 Read this manual and learn how to safely operate and maintain your Frontier Series How the Greenwood Frontier Works The Fronti...

Страница 12: ...ombustion temperatures 3 Crossfire Zone Over fire air is added following the separation of gases from the wood pile 4 Burn Out Zone Combustion is completed in the burn out zone where gas temperatures...

Страница 13: ...the burn rate of the furnace balancing a clean burn heat demand 3 Fluid passing through the internal heat exchange manifold is heated by the exiting combustion gasses 4 The heated fluid enters the Fr...

Страница 14: ...ity local climate type of wood burned etc Square footage based sizing is unreliable always base sizing on sustained output and heat loss calculations Greenwood Frontier CX Sizing The Frontier Series C...

Страница 15: ...SPECIFICATIONS 2013 Greenwood Clean Energy Inc All Rights Reserved V1 9 Page 11 Greenwood Frontier CX Component Identification See Piping Section for piping component identification...

Страница 16: ...s all draw air from the room Be certain there is an adequate source of fresh air to offset these demands or you may create negative pressure in the room and starve the furnace of air needed for combus...

Страница 17: ...ver leaves If damaged list the issues and date on the shipping document and ask the driver to sign it Check the packing slip for a list of items shipped with the furnace some of the items will be foun...

Страница 18: ...s in the lifting channels under the chassis with the forks spread to minimize the overhang on either side Move the loader as close to the furnace as possible without contacting the furnace with the li...

Страница 19: ...sheet metal placed 1 Underneath the furnace 2 At least 16 inches 406 mm in front and 8 inches 203 mm on either side of the fuel loading and ash removal door and 3 Underneath the chimney connector and...

Страница 20: ...CX is required to be attached when the appliance is installed on a combustible floor The Heat Shield slides through the side front openings of the unit s skids Secure each shield in place with the se...

Страница 21: ...od Frontier hydronic furnace or in your home s heating system Always use propylene glycol based coolants rated for heating applications which contain the necessary additives to protect your system DO...

Страница 22: ...e 6 to 5 Imperial Stove Pipe Reducer sold by Ace Hardware Product UPC 0634672300069 Chimney Height The Frontier Series is a forced draft system which means the induction fan will control the draft thr...

Страница 23: ...minimum outward rise of 1 4 0 6 cm per horizontal 12 30 5 cm 3 If the connector stovepipe must go through a combustible wall before entering the masonry chimney consult a qualified mason or chimney de...

Страница 24: ...t be at least 12 feet 3 7 m Furnace Min Flue Diameter Frontier CX 5 inches 12 7 cm Warning Solid wood burning furnaces should NOT be side vented When installing a new chimney flue be sure to observe l...

Страница 25: ...ned or unconfined by dividing the total volume of the room by the total fuel input requirement for all appliances in the room a If the result is greater than or equal to 50 CF 1 42 CM 1000 BTU 0 29 KW...

Страница 26: ...ng after 2 hours 4 Using the manometer measure the draft in the flue a If the draft measurement is below 05 WC 12 45 Pa at full fire there is too little draft and corrective measures are required to a...

Страница 27: ...ospheric system While having the highest quality welds the heat exchanger is not an ASME certified pressure vessel Steps to connect the hydronic system 1 Connect the distribution loop to the supply an...

Страница 28: ...System Part No 100110 NOTE All plumbing schematics shown in this section are for illustration purposes only Actual systems may require control and safety devices not shown in these illustrations Cons...

Страница 29: ...PLUMBING INSTALLATION 2013 Greenwood Clean Energy Inc All Rights Reserved V1 9 Page 25 Pi ping Schematics...

Страница 30: ...PLUMBING INSTALLATION Page 26 2013 Greenwood Clean Energy Inc All Rights Reserved V1 9...

Страница 31: ...mponents to meet the following requirements Hydronic System Functionality Frontier CX with install package Without install package Requirements Frontier Series Boiler Control System Outlet temperature...

Страница 32: ...grains Nitrite is not included in our approved treatments as nitrites promote bacterial growth in vented systems Conductivity should not exceed 3 500 mmhos in treated water Without high nitrite levels...

Страница 33: ...v 9100 Cleans cutting oil rust and solder flux from new systems Removes scale corrosion and bacteria from fouled systems See tech sheet Hydro Solve 9100 dilutes 1 50 so one to two gallons will be suff...

Страница 34: ...be powered until the system is filled with fluid See diagram FW1 ThermSafeTM Overheat Cooling System The transformer that powers the system requires plugging into a 115 volt 60 cycle wall socket See d...

Страница 35: ...WIRING 2013 Greenwood Clean Energy Inc All Rights Reserved V1 9 Page 31...

Страница 36: ...Greenwood Boiler Management logic shuts down combustion and enables gravity fed cooling through the expansion tank when the power goes out or the outlet temperature rapidly rises beyond the set point...

Страница 37: ...or more than a few pumps Cost will be proportional to duration of outage coverage Installation difficulty Moderate Additional electrical and plumbing work may be required Source www apc com Auto star...

Страница 38: ...d by use of an additional aquastat and relay note these components are not included with the furnace The aquastat and relay keep the central furnace from firing unless there is insufficient heat comin...

Страница 39: ...m The integrated Greenwood Boiler Management System is a micro processor based controller that continuously optimizes boiler performance The control system is designed to ensure safe operating conditi...

Страница 40: ...and body well away from the door until it is completely open 6 BE CAREFUL when working around an open firebox door The vermiculite attached to the firebox door and the steel surrounding the firebox do...

Страница 41: ...he firebox and void your warranty Place three small logs across the top of the newspaper and kindling supported by the two bottom logs ENSURE THAT FIREWOOD IS WELL SEASONED 1 Light the paper and kindl...

Страница 42: ...verloading causes incomplete combustion of the fuel resulting in smoke and possibly a build up of creosote in the furnace This can potentially void the warranty on your furnace 5 Keep in mind the heat...

Страница 43: ...protection whenever working around an open firebox door 4 Observe the following tips when feeding the fire a If a fire is burning let the wood load burn down as much as possible before refilling b Pr...

Страница 44: ...nt factor in selecting a wood to burn We recommend using whatever wood is most economically available in your area Useful tips to help you in buying wood A cord is a stack of wood 4 feet 1 22 m high 4...

Страница 45: ...14 7 Basswood 2 108 13 5 Beech Blue 3 890 26 8 Beech High 3 757 24 Birch Black 3 890 26 8 Birch Gray 3 179 20 3 Birch Paper 3 179 20 3 Birch White 3 179 20 3 Birch Yellow 3 689 23 6 Box Elder 2 797 17...

Страница 46: ...ashes on the ground or place them in the garbage Hot Furnace 1 Wear protective clothing leather hearth gloves and eye protection 2 Open the firebox door and stir the ash to determine if live coals ar...

Страница 47: ...e if needed to maintain a good seal 6 Exercise the safety relief valve at least once a year lift the handle and allow water to escape 7 DO NOT clean furnace surfaces when the unit is hot Wait until th...

Страница 48: ...Lid by using a wrench to remove the lid nuts Lift off the lid using the lid handles Inspect the heat exchanger rope gasket for wear Contact your dealer to replace the gasket if it appears worn 5 Remo...

Страница 49: ...chimney flue and blower housing 6 Clean the heat exchanger See above 7 Place a cap over the chimney to prevent birds and debris from entering 8 Clean the surface of the furnace with soap and water CA...

Страница 50: ...all your dealer for service Error Light on Control Panel The control system is designed to ensure safe operating conditions and to initiate an automatic shut down in the event of an error If normal st...

Страница 51: ...your dealer Creosote or Condensation is Forming Formation of creosote and condensation are not typical for the Frontier Series furnace and is a sign that the system is not performing optimally Green...

Страница 52: ...ir intake lids fully close when solenoids powered off Inspect and remove any debris that may prevent the lids from closing completely flat Improper fuel Check the fuel wood you are burning Do not burn...

Страница 53: ...d during high burn Do not open the door if there is a Red light under the Smoke Guard button is lit The Green Light indicates that The Smoke Guard button may be pushed and the door can be safely opene...

Страница 54: ...WA This page intentionally left blank...

Страница 55: ...mount paid by Greenwood based on time since year of purchase Product Yr 1 Yr 2 Yr 3 Yr 4 Yr 5 Yr 6 Yr 7 Frontier Series 100 75 60 40 25 15 10 The installation of replacements parts or components under...

Страница 56: ...This page intentionally left blank...

Страница 57: ...This page intentionally left blank...

Страница 58: ...c Furnace Installation and Operation V1 9 Issue Date September 2013 Part No D100100 Printed in USA GREENWOOD CLEAN ENERGY INC 13429 SE 30TH Street Suite A Bellevue WA 98005 USA 2013 Greenwood Clean En...

Отзывы: