PLUMBING INSTALLATION
Page 24
© 2013 Greenwood Clean Energy, Inc All Rights Reserved V1.9
Hydronic System Configuration
The Frontier Series Hydronic Conditioning Manifold (Part No. 100100) ensures a consistent flow rate
through the internal heat exchanger and protects the boiler from condensation caused by low return
temperatures. The Hydronic Conditioning Manifold may be piped with the installer provided atmospheric
expansion tank connected on either the right or left side of the manifold (as shown in Schematic FP3A and
FP3B). The tank does double duty as both expansion tank and reservoir for the ThermSafe Overheat Cooling
System (Part No. 100110).
NOTE:
All plumbing schematics shown in this section are for illustration purposes only. Actual systems may
require control and safety devices not shown in these illustrations. Consult your Greenwood certified home
heating and plumbing professional for home heating system design and installation.
Flat Plate Heat Exchangers
Q: When should I use a Flat Plate Heat Exchanger?
A: Flat plate heat exchangers are used to transfer heat between one circulation system and another. A
mixture of propylene glycol and water flows through the manifold on the furnace side of the flat plate heat
exchanger. This fluid does not mix with the fluid flowing through the distribution side of the heat exchanger.
A flat plate heat exchanger is used when the system requires isolating:
1.
Pressure differences.
2.
Fluid differences.
Содержание Frontier CX
Страница 1: ......
Страница 3: ...This page intentionally left blank...
Страница 4: ......
Страница 8: ...SAFETY Page 4 2013 Greenwood Clean Energy Inc All Rights Reserved V1 9 SAFETY WARNINGS LABEL...
Страница 9: ...SAFETY 2013 Greenwood Clean Energy Inc All Rights Reserved V1 9 Page 5 LABEL LOCATIONS...
Страница 10: ...SAFETY Page 6 2013 Greenwood Clean Energy Inc All Rights Reserved V1 9 This page intentionally left blank...
Страница 29: ...PLUMBING INSTALLATION 2013 Greenwood Clean Energy Inc All Rights Reserved V1 9 Page 25 Pi ping Schematics...
Страница 30: ...PLUMBING INSTALLATION Page 26 2013 Greenwood Clean Energy Inc All Rights Reserved V1 9...
Страница 35: ...WIRING 2013 Greenwood Clean Energy Inc All Rights Reserved V1 9 Page 31...
Страница 54: ...WA This page intentionally left blank...
Страница 56: ...This page intentionally left blank...
Страница 57: ...This page intentionally left blank...