TABLE OF CONTENTS
© 2013 Greenwood Clean Energy, Inc All Rights Reserved V1.9
Page 1
TABLE OF CONTENTS
TABLE
OF
CONTENTS
................................................................................................................................................
1
APPLIANCE
IDENTIFICATION
.....................................................................................................................................
3
SAFETY
.....................................................................................................................................................................
4
WARNINGS
LABEL
..........................................................................................................................................................
4
LABEL
LOCATIONS
..........................................................................................................................................................
5
INTRODUCTION........................................................................................................................................................
7
.......................................................................................................................................................................................
7
How
the
Greenwood
Frontier
Works
.............................................................................................................................
7
Air
Flow
through
the
Furnace
........................................................................................................................................
8
Fluid
Flow
through
the
Furnace
.....................................................................................................................................
9
SPECIFICATIONS
.....................................................................................................................................................
10
Specifications
Table......................................................................................................................................................
10
Greenwood
Frontier
CX
Sizing
......................................................................................................................................
10
Greenwood
Frontier
CX
Component
Identification
......................................................................................................
11
.....................................................................................................................................................................................
11
INSTALLATION
PREPARATION
................................................................................................................................
12
Installation
Requirements
Checklist
.............................................................................................................................
12
1.
Unpack
and
Inspect
the
Furnace
..............................................................................................................................
13
2.
Unload
the
Furnace
..................................................................................................................................................
14
3.
Locate
the
Furnace
...................................................................................................................................................
15
Minimum
Installation
Clearances
................................................................................................................................
15
4.
Install
the
Combustible
Floor
Heat
Shield
................................................................................................................
16
5.
Install
the
Chimney
Flue
...........................................................................................................................................
16
6.
Plumb
the
Furnace
...................................................................................................................................................
17
7.
Wire
the
Furnace
......................................................................................................................................................
17
CHIMNEY
INSTALLATION
........................................................................................................................................
18
Chimney
Size
................................................................................................................................................................
18
Connecting
to
an
Existing
Chimney
Flue
......................................................................................................................
18
Connecting
to
a
New
Factory
‐
made
Chimney
..............................................................................................................
20
Supplying
Make
‐
up
Air
.................................................................................................................................................
21
Measuring
and
Adjusting
the
Draft
.............................................................................................................................
22
References
....................................................................................................................................................................
22
PLUMBING
INSTALLATION
......................................................................................................................................
23
Содержание Frontier CX
Страница 1: ......
Страница 3: ...This page intentionally left blank...
Страница 4: ......
Страница 8: ...SAFETY Page 4 2013 Greenwood Clean Energy Inc All Rights Reserved V1 9 SAFETY WARNINGS LABEL...
Страница 9: ...SAFETY 2013 Greenwood Clean Energy Inc All Rights Reserved V1 9 Page 5 LABEL LOCATIONS...
Страница 10: ...SAFETY Page 6 2013 Greenwood Clean Energy Inc All Rights Reserved V1 9 This page intentionally left blank...
Страница 29: ...PLUMBING INSTALLATION 2013 Greenwood Clean Energy Inc All Rights Reserved V1 9 Page 25 Pi ping Schematics...
Страница 30: ...PLUMBING INSTALLATION Page 26 2013 Greenwood Clean Energy Inc All Rights Reserved V1 9...
Страница 35: ...WIRING 2013 Greenwood Clean Energy Inc All Rights Reserved V1 9 Page 31...
Страница 54: ...WA This page intentionally left blank...
Страница 56: ...This page intentionally left blank...
Страница 57: ...This page intentionally left blank...