OPERATING THE FRONTIER CX
Page 42
© 2013 Greenwood Clean Energy, Inc All Rights Reserved V1.9
Ash Removal
Your clean-burning Frontier Series requires less frequent cleaning than wood stoves or similar devices.
However, when the ash build-up impedes the flow of air through the pin holes in the bottom grate; it is time
to remove ash. Please observe the following procedures.
Cold Furnace
1.
Make doubly sure the furnace is cool.
2.
Stir the ash to make sure there are no live embers.
3.
Shovel the ash into a metal container with a tight fitting lid and move it outdoors. Do not place other
waste in this container.
4.
Bury or locally disperse the cold ashes on the ground or place them in the garbage.
Hot Furnace
1.
Wear protective clothing, leather hearth gloves and eye protection.
2.
Open the firebox door and stir the ash to determine if live coals are present. Push hot coals to the side.
3.
Shovel the ash into a metal container with a tight fitting lid and move it outdoors. Do not place other
waste in this container.
4.
Place the closed container on a non-combustible surface and away from combustible materials. Allow it
to cool for several days.
5.
Bury or locally disperse the cold ashes on the ground or place them in the garbage.
WARNING:
Use caution when working around an open firebox door. The refractory in the
firebox and the steel frame surrounding the door are
VERY HOT
. Wear protective clothing,
leather hearth gloves and eye protection whenever you work around the open firebox door.
Содержание Frontier CX
Страница 1: ......
Страница 3: ...This page intentionally left blank...
Страница 4: ......
Страница 8: ...SAFETY Page 4 2013 Greenwood Clean Energy Inc All Rights Reserved V1 9 SAFETY WARNINGS LABEL...
Страница 9: ...SAFETY 2013 Greenwood Clean Energy Inc All Rights Reserved V1 9 Page 5 LABEL LOCATIONS...
Страница 10: ...SAFETY Page 6 2013 Greenwood Clean Energy Inc All Rights Reserved V1 9 This page intentionally left blank...
Страница 29: ...PLUMBING INSTALLATION 2013 Greenwood Clean Energy Inc All Rights Reserved V1 9 Page 25 Pi ping Schematics...
Страница 30: ...PLUMBING INSTALLATION Page 26 2013 Greenwood Clean Energy Inc All Rights Reserved V1 9...
Страница 35: ...WIRING 2013 Greenwood Clean Energy Inc All Rights Reserved V1 9 Page 31...
Страница 54: ...WA This page intentionally left blank...
Страница 56: ...This page intentionally left blank...
Страница 57: ...This page intentionally left blank...