Spraying
Spraying
Spraying
The Fusion AP gun is shown.
1. Engage gun piston safety lock and close gun
luid inlet valves A and B.
Fusion
Fusion
Fusion
Probler
Probler
Probler
2. Attach gun luid manifold. Connect gun air line.
Open air line valve.
3. Adjust the gun air pressure. Do not exceed 130
psi (0.2 MPa, 2 bar).
4. Set PRESSURE RELIEF/SPRAY valves (SA,
SB) to SPRAY
.
SB
SA
GA
GB
5. Verify heat zones are on and temperatures are
on target, see
6. Open luid inlet valve (FV) located at each pump
inlet.
7. Press
to start motor and pumps.
8. Adjust pressure compensator knob to desired
luid stall pressure. Turn knob clockwise to
increase pressure and counter-clockwise to
decrease pressure. Use hydraulic pressure
gauge (HPG) to view hydraulic pressure. Once
desired luid stall pressure is set, lock the knob
in place by rotating lower portion clockwise until
tight.
Component A and B outlet pressures will be
higher than the hydraulic set pressure, depending
on the model. Component A and B (GA, GB)
pressure may be viewed on the pressure gauges
or the ADM.
334945C
49
Содержание Reactor 2 Hydraulic
Страница 19: ...Notes Notes Notes Notes 334945C 19...
Страница 68: ...Dimensions Dimensions Dimensions Dimensions 68 334945C...
Страница 69: ...Notes Notes Notes Notes 334945C 69...