Installation
The
BetaCell 241
machine is assembled on a heavy-duty steel frame that accepts all the major operating
components. The machine will arrive from the factory pre-assembled, completely tested and ready for installation.
It will be required to set the unit in place, provide electric service to the main electric panel, the air supply, service
the hydraulic and buffer tanks, and connect the hoses and gun.
Prior to installing the machine, check for any damage that may have occurred during transit. If any damage is
found, please notify GUSMER immediately.
The machine is to be installed on a flat surface in an area that permits 360-degree access for maintenance and
operation.
The metering unit was plumbed, wired and tested at the factory. For transporting purposes, the unit was drained of
all fluids and the chemical hoses were detached.
Every attempt has been made to prevent the accidental connection of chemical hoses to the wrong source. The Pre-
polymer pressure hose is color coded green for pressure and green/white for return. The Curative pressure hose is
color-coded yellow for pressure and yellow/white for return.
We recommend the metering unit be installed and commissioned by one of our factory-trained technicians. This
guarantees the correct installation.
Solvents and Chemicals
High Voltage
High Pressure
Personal
Protective
Equipment
Содержание BetaCell 241D
Страница 6: ...6...
Страница 8: ...Specifications System Dimensions 54 108 98 3 16...
Страница 11: ...11 DESCRIPTION OF CONTROLS 1...
Страница 15: ...15 Help Screen A Help Screen is available for each of the Menu Screens...
Страница 24: ...24 Maintenance Menu Press to access the Maintenance screen Password Required...
Страница 30: ...30 AutoStart Set Up Screen This screen is for qualified technicians only...
Страница 31: ...31 Sleep Mode Set Up Screen This screen is for qualified technicians only...
Страница 37: ...37 DESCRIPTION OF MAJOR COMPONENTS 2...
Страница 38: ...38 System Schematic...
Страница 44: ...44 Buffer tank 2 1 6 7 5 8 9 4 3...
Страница 45: ...45 13 10 12 Fumes piped away by others in accordance with plant specifications 11...
Страница 55: ...55 AutoFill Valve Maintenance There is no normal operating maintenance Position Indicator...
Страница 65: ...65 Hydraulic Power Pack Schematic...
Страница 78: ...78 DAILY PROCEDURES 4...
Страница 80: ...80 FAULT MANAGEMENT 5...
Страница 88: ...88 MAINTENANCE 6...