89
BetaCell 241 Maintenance Procedure
Description Procedure
Time
1. Access Machine Control screen via Main Menu on PV
2. Touch Auto Startup
3. Access Status screen via Main Menu on PV
4. System is ready when correct ratio is displayed, temperatures
have reached process temperatures and a green GO is at the
bottom of screen
5. Access Operator screen via Main Menu on PV
6. Select correct Sequence and touch Reset
Auto Startup from
Sleep Mode
7. Trigger
Gun
10 min
8. Access Machine Control screen via Main Menu on PV
9. Verify switches on front panel are in run position
10. Touch Auto Startup
11. Access Status screen via Main Menu on PV
12. System is ready when correct ratio is displayed, temperatures
have reached process temperatures and a green GO is at the
bottom of screen
13. Access Operator screen via Main Menu on PV
14. Select correct Sequence and touch Reset
Auto Startup from
Complete Shut Down
(Buffer tank temp. >
100ºF)
15. Trigger Gun
15-20
min
16. Access Tank Control Screen
17. Turn on Curative and Pre poly Agitators
Auto Startup from
Complete Shut Down
(Buffer tank temp. <
90ºF)
18. Turn on Tank heaters. Allow material temperature to increase
above 90ºF.
2 hours
Содержание BetaCell 241D
Страница 6: ...6...
Страница 8: ...Specifications System Dimensions 54 108 98 3 16...
Страница 11: ...11 DESCRIPTION OF CONTROLS 1...
Страница 15: ...15 Help Screen A Help Screen is available for each of the Menu Screens...
Страница 24: ...24 Maintenance Menu Press to access the Maintenance screen Password Required...
Страница 30: ...30 AutoStart Set Up Screen This screen is for qualified technicians only...
Страница 31: ...31 Sleep Mode Set Up Screen This screen is for qualified technicians only...
Страница 37: ...37 DESCRIPTION OF MAJOR COMPONENTS 2...
Страница 38: ...38 System Schematic...
Страница 44: ...44 Buffer tank 2 1 6 7 5 8 9 4 3...
Страница 45: ...45 13 10 12 Fumes piped away by others in accordance with plant specifications 11...
Страница 55: ...55 AutoFill Valve Maintenance There is no normal operating maintenance Position Indicator...
Страница 65: ...65 Hydraulic Power Pack Schematic...
Страница 78: ...78 DAILY PROCEDURES 4...
Страница 80: ...80 FAULT MANAGEMENT 5...
Страница 88: ...88 MAINTENANCE 6...