97
150.Remove any residual chemical on filter bowl threads and coat
threads with grease
151.Replace filter bowl
152.Open ball valve and ball valve
153.Follow Curative pump startup procedure
154.Access Machine Control screen via Main Menu on PV
155.Touch Auto Shutdown
156.Lock out main disconnect
157.Close and Lock out ball valve
158.Drain pressure in Pre Poly line by opening drain valve in front
of machine into appropriate container
159.Close and Lock out ball valve
160.Remove SHCS that secure inlet flange to pump
161.Remove SHCS that secure outlet flange to pump
162.Disconnect encoder cable on rear of motor
163.Disconnect wires in electrical junction box and label
164.Remove HHCS securing motor to unit
165.Remove motor/pump assembly
166.Disassemble and replace pump with new
167.Reinstall motor/pump assembly
168.Reinstall inlet and outlet flanges to pump
169.Reconnect power and encoder cable
Remove and Replace
Pre Poly Pump
170.Open ball valves
40 min
Содержание BetaCell 241D
Страница 6: ...6...
Страница 8: ...Specifications System Dimensions 54 108 98 3 16...
Страница 11: ...11 DESCRIPTION OF CONTROLS 1...
Страница 15: ...15 Help Screen A Help Screen is available for each of the Menu Screens...
Страница 24: ...24 Maintenance Menu Press to access the Maintenance screen Password Required...
Страница 30: ...30 AutoStart Set Up Screen This screen is for qualified technicians only...
Страница 31: ...31 Sleep Mode Set Up Screen This screen is for qualified technicians only...
Страница 37: ...37 DESCRIPTION OF MAJOR COMPONENTS 2...
Страница 38: ...38 System Schematic...
Страница 44: ...44 Buffer tank 2 1 6 7 5 8 9 4 3...
Страница 45: ...45 13 10 12 Fumes piped away by others in accordance with plant specifications 11...
Страница 55: ...55 AutoFill Valve Maintenance There is no normal operating maintenance Position Indicator...
Страница 65: ...65 Hydraulic Power Pack Schematic...
Страница 78: ...78 DAILY PROCEDURES 4...
Страница 80: ...80 FAULT MANAGEMENT 5...
Страница 88: ...88 MAINTENANCE 6...