92
59. Drain pressure in Pre Poly line by drain valve in front of
machine
Now maintenance can be performed on the Pre Poly system
60. Open Pre Poly Buffer tank outlet valve
61. Close air ball valve on top of Pre Poly Buffer tank
62. Open air inlet ball valve
63. If temperature is within 20
o
F of setpoint, access Flow Control
Screen. If not, see Note below.
64. Touch Flow Control Manual, touch Pre Poly Start Motor
65. Touch Flow Control Auto
66. Access Status screen via Main Menu on PV
67. Verify ratio and temperatures are at setpoint
68. Access Operator screen via Main Menu on PV
69. Verify GO condition exists at bottom of screen
70. Select correct Sequence and touch Reset
71. Trigger Gun
NOTE: If temperature is below
20
o
F of setpoint,
a) Access Machine Control screen via Main Menu on PV
b) Touch Auto Shutdown
c) Wait 2 minutes, and Touch Auto Startup
d) Access Status screen via Main Menu on PV
e) System is ready when correct ratio is displayed,
temperatures have reached process temperatures and a
green GO is at the bottom of screen
f) Access Operator screen via Main Menu on PV
g) Select correct Sequence and touch Reset
Start Pre poly Pump
and Pressurize
System
h) Trigger Gun
10-15
min
Содержание BetaCell 241D
Страница 6: ...6...
Страница 8: ...Specifications System Dimensions 54 108 98 3 16...
Страница 11: ...11 DESCRIPTION OF CONTROLS 1...
Страница 15: ...15 Help Screen A Help Screen is available for each of the Menu Screens...
Страница 24: ...24 Maintenance Menu Press to access the Maintenance screen Password Required...
Страница 30: ...30 AutoStart Set Up Screen This screen is for qualified technicians only...
Страница 31: ...31 Sleep Mode Set Up Screen This screen is for qualified technicians only...
Страница 37: ...37 DESCRIPTION OF MAJOR COMPONENTS 2...
Страница 38: ...38 System Schematic...
Страница 44: ...44 Buffer tank 2 1 6 7 5 8 9 4 3...
Страница 45: ...45 13 10 12 Fumes piped away by others in accordance with plant specifications 11...
Страница 55: ...55 AutoFill Valve Maintenance There is no normal operating maintenance Position Indicator...
Страница 65: ...65 Hydraulic Power Pack Schematic...
Страница 78: ...78 DAILY PROCEDURES 4...
Страница 80: ...80 FAULT MANAGEMENT 5...
Страница 88: ...88 MAINTENANCE 6...