EXTRAORDINARY MAINTENANCE
Contact your local Authorised Service Centre for
any procedures not considered to be ordinary
maintenance.
Repairs carried out by unauthorised service cen-
tres and unqualified personnel will invalidate the
warranty.
ONLY USE AND REQUEST ORIGINAL SPARE
PARTS.
STORAGE
If you do not follow these
instruction oily deposits may form in the carbu-
rettor, making starting difficult or causing perma-
nent damage due to disuse of the brush cutter.
1. Clean the outer part of the engine, the drive
assembly, the guard and the line head.
2. Empty the fuel tank.
3. After emptying the fuel tank start the engine.
4. Run the motor at minimum speed until it stops
to remove all fuel from the carburettor.
5. Allow the engine to cool (about 5 minutes).
6. Use the specific key to remove the spark plug.
7. Pour in 1 teaspoonful of 2-stroke engine oil
(new oil). Pull the starter cord a few times to
cover the internal components with a layer of
oil. Refit the spark plug.
8. Store the brush cutter in a cool, dry place, far
from sources of heat (such as radiators, boil-
ers, etc.) or naked flames.
PREPARING THE BRUSH CUTTER AFTER
STORAGE
1. Remove the spark plug.
2. Pull the starter cord vigorously to remove
excess oil from the combustion chamber.
3. Clean and check the gap (distance between
electrodes) of the spark plug or fit a new spark
plug with a suitable gap.
4. Prepare the brush cutter for use
5. Fill the tank with suitable fuel. See paragraph
FUEL AND LUBRICANT.
IMPORTANT
ALL OUR MACHINES ARE TOP QUALITY. THEY
ARE PERFECTLY TUNED AND ARE DESIGNED
SO THAT THE OPERATOR CAN WORK IN MAX-
IMUM SAFETY.
– NEVER TAMPER WITH MACHINES
– NEVER WORK WITH MACHINES WITH MISS-
ING OR DAMAGED PARTS.
34
NORMAL MAINTENANCE
EN
– Do not cause disturbance to the natural
environment and those around you.
– Always work in safety.
– Avoid hazardous situations.
– Never work alone, especially in remote
areas.
– Take care over those around you and
possible dangers.
– Always wear personal protective gar-
ments.
– Only work with appropriate saws to safe-
ty standards and which have been sub-
jected to regular accurate servicing per-
formed by a skilled person!!!
– RESPECT THE ECOSYSTEM!!
Содержание BJ 250
Страница 2: ......
Страница 5: ...3 19 21 22 24 25 28 29 17 23 18 20 26 A 27 E...
Страница 6: ...4...
Страница 119: ...EL 117...
Страница 121: ...EL 119 1 2 3 85 dB A 4 5 15m 6 7 8 LWA 2000 14 9 10 11 12 13 14 15 16 17 1 min 1 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 2...
Страница 122: ...1 2 3 4 15 5 6 B 1 2 3 120 EL...
Страница 123: ...3 4 5 STOP 6 7 C 1 2 3 4 5 6 7 8 3 4 9 10 15 11 15 12 13 14 121 EL...
Страница 124: ...15 16 D 1 2 3 4 5 6 7 8 9 10 11 122 EL MONO 1 barrier DUPLEX 2 2...
Страница 125: ...A E 2 3 2 4 a C D b H A 5 a C b H A 6 A B C D E D E F D E G 7 123 EL...
Страница 126: ...60 2 50 1 2 2 di olio SYNTETIC OIL 2T 4 25 1 4 124 EL...
Страница 127: ...8 stop START 9 1 2 3 9 4 10 6 7 5 10 2 CLOSE RUN I CLOSE 10 11 RUN I 10 125 EL...
Страница 128: ...12 STOP 13 T 126 EL...
Страница 129: ...OFF STOP 15 30 4 60 90 14 3 2 cm 15 Tap Go 16 17 127 EL...
Страница 130: ...18 19 20 30 21 15 22 128 EL...
Страница 131: ...3 4 23 24 25 A B C 3 4 26 1 A 2 3 4 27 1 0 6 mm 025 2 3 12 15 Nm 28 STOP 1 E 29 2 129 EL...
Страница 132: ...1 2 3 4 5 5 6 7 1 8 1 2 3 4 5 130 EL...
Страница 133: ...EL 131...
Страница 263: ...RU 261...
Страница 266: ...A A 1 1 2 2 3 3 4 4 15 5 5 6 6 1 1 2 2 3 3 264 RU...
Страница 267: ...4 4 5 5 STOP 6 6 7 7 1 1 2 2 3 3 4 4 5 5 6 6 7 7 8 8 3 4 9 9 1 10 0 15 1 11 1 15 1 12 2 1 13 3 1 14 4 265 RU...
Страница 268: ...1 15 5 1 16 6 1 1 2 2 3 3 4 4 5 5 6 6 7 7 8 8 9 9 1 10 0 1 11 1 266 RU D DU UP PL LE EX X 2 2 A 2 M MO ON NO O 1 1...
Страница 269: ...A E E 2 2 3 3 4 4 a a A B C D E A 5 5 a a A B C A 6 6 D D F D E G 7 7 267 RU...
Страница 270: ...60 2 2 5 50 0 1 1 2 2 2 2 d dii o olliio o S SY YN NT TE ET TI IC C O OI IL L 2 2T T 4 2 25 5 1 1 4 4 268 RU...
Страница 271: ...8 START 9 1 2 K K K 3 9 4 10 6 7 5 10 2 K I K 10 K 11 I 10 K 269 RU...
Страница 272: ...1 12 2 STOP 13 270 RU...
Страница 273: ...S ST TO OP P 1 15 5 3 30 0 4 60 90 14 2 15 Tap Go 16 17 271 RU...
Страница 274: ...18 1 19 9 2 20 0 30 2 21 1 1 15 5 2 22 2 272 RU...
Страница 275: ...3 3 4 4 23 24 25 3 4 2 26 6 1 A 2 3 4 2 27 7 1 0 6 2 3 12 15 Nm 2 28 8 STOP 1 29 2 273 RU...
Страница 276: ...1 2 3 4 5 5 6 7 1 8 1 2 3 4 5 274 RU...
Страница 295: ......
Страница 296: ...171501019 1 Realizzazione EDIPROM bergamo GGP ITALY SPA Via del Lavoro 6 I 31033 Castelfranco Veneto TV ITALY...