
3
Table of Contents
2.10. Piping ..................................................................................................................................................................... 19
2.11. Air Cooled Unit Piping ........................................................................................................................................... 20
2.12. Discharge Lines ...................................................................................................................................................... 20
2.13. Liquid Lines ............................................................................................................................................................ 22
2.14. Recommended Line Sizing, Air Cooled Units ........................................................................................................ 22
2.15. Connection Sizes, Air Cooled Units ....................................................................................................................... 23
2.16. Field Piping, Remote Condenser Above Evaporator ............................................................................................. 24
2.17. Field Piping, Remote Condenser Below Evaporator ............................................................................................. 25
2.18. Refrigerant Piping Protection ................................................................................................................................ 26
2.19. Water/Glycol Cooled Unit Piping .......................................................................................................................... 27
2.20. Field Piping, Water/Glycol System ........................................................................................................................ 28
2.21. Connection Sizes, Water/Glycol Cooled Units ...................................................................................................... 29
2.22. Connection Sizes, Fluid Coolers (Dry Coolers) ...................................................................................................... 29
2.23. Factory Charge for Water/Glycol Cooled System .................................................................................................. 30
2.24. Auxiliary Chilled Water/Energy Saver Coil Piping.................................................................................................. 30
2.25. Condensate Drain Piping ....................................................................................................................................... 30
2.26. Humidifier Piping .................................................................................................................................................. 31