![Gentherm CSZ Blanketrol II 222S Скачать руководство пользователя страница 25](http://html1.mh-extra.com/html/gentherm/csz-blanketrol-ii-222s/csz-blanketrol-ii-222s_operation-and-technical-manual_2213792025.webp)
OPERATION
BLANKETROL II, Model 222S
OPERATION AND TECHNICAL MANUAL
Page 25 of 110
SECTION 2. GENERAL PREPARATION OF THE BLANKETROL II
SYSTEM
2-0. INTRODUCTION
This section describes the procedures to prepare the BLANKETROL II unit for general use.
This entails unpacking the shipment, arranging all the equipment for the first time, and
completing a test routine. This section also outlines the bactericidal agent preparations,
standard safety precautions, and patient preparation/bedside care when using the hyper-
hypothermia blanket(s). Technical support is available upon request.
2-1. UNPACKING THE SHIPMENT
WARNING
Remove the BLANKETROL II from service if the outer casing or membrane control panel
is cracked or internal components are exposed.
Contact with internal components
could result in electric shock or thermal injury to the patient or operator and
exposure to sharp edges.
Cut the bands at the bottom of the carton. Lift off the cardboard box and lift the unit from the
cardboard insert. Locate and remove the envelope containing the manual.
During the unpacking process, look carefully for signs of shipping damage. If any unacceptable
damage is found, notify the transportation company immediately and file a claim. The
transportation company is responsible for the shipment after it leaves the factory. If problems
other than shipping damage are found, notify your Cincinnati Sub-Zero representative or
manufacturer (Cincinnati Sub-Zero Products LLC) directly.
2-2. FIRST TIME SET-UP/SYSTEM TEST ROUTINE
CAUTION
If the unit was shipped on its side, permit the unit to rest in an upright position for twelve
(12) hours before operating due to refrigeration oil displacement.
This section describes the tasks necessary to inspect and arrange the equipment for the first
time after unpacking and describes a System Test Routine to check out the membrane control
panel.
The System Test Routine can also be used to teach operators unfamiliar with the equipment
how to use the unit.
2-2.1. Inspecting And Arranging The Equipment
A. Place the BLANKETROL II unit in an uncluttered work space that is accessible to the
correct power source with an ambient temperature between 15°C
– 30°C (59°F – 86°F).
Position the unit so that the membrane control panel faces the operator.
B. Visually inspect the BLANKETROL II unit to determine that there are no missing parts,
unusual dents, or punctures.
Содержание CSZ Blanketrol II 222S
Страница 112: ......