133
MAINTENANCE
Every 50 Hours
Inspecting the Bucket Stoppers
(bolts / nuts)
WARNING
Before performing maintenance or
repairs under the machine, set all working
equipment against the ground or in the
lowermost position.
1. Park the machine on firm, level ground
and remove the bucket.
2. Retract the bucket cylinders and lift arm
cylinders to the minimum length.
3. Inspect the adjusting bolts (1) and lock
nuts (2) for bending, denting, deformation
and looseness.
4. If there are any irregularities with the
adjusting bolts (1) and lock nuts (2).
Refer to page 140, “Adjusting or Replacing
the Bucket Stoppers (bolts/nuts)”.
Содержание CTL55
Страница 1: ...CTL55 CTL65 CTL75 CTL85 Compact Track Loader OPERATOR S MANUAL Revision E 09 10...
Страница 6: ...4...
Страница 8: ...6...
Страница 38: ...SAFETY 36 Safety Signs Decals...
Страница 39: ...37 SAFETY Safety Signs Decals...
Страница 40: ...SAFETY 38 Safety Signs Decals...
Страница 66: ...64 MEMO...
Страница 67: ...65 MEMO...
Страница 68: ...66 MEMO...
Страница 69: ...67 MEMO...
Страница 70: ...68...
Страница 114: ...MAINTENANCE 112 Maintenance Log Date Hours Service Procedure...
Страница 115: ...113 MAINTENANCE Maintenance Log Date Hours Service Procedure...
Страница 123: ...121 MEMO...
Страница 129: ...127 MEMO...
Страница 156: ...154...
Страница 170: ...168...
Страница 171: ...169 Main Speci cations 170 Machine Dimensions 174 Operating Range 176 SPECIFICATIONS...
Страница 176: ...SPECIFICATIONS 174 Machine Dimensions...
Страница 178: ...SPECIFICATIONS 176 Operating Range T7K0021 F H C A D B G E...
Страница 180: ...178...
Страница 181: ...179 General Precautions 180 Air Conditioner CTL55 182 OPTIONS...
Страница 193: ...191 MEMO...
Страница 194: ...192...
Страница 195: ...193 INDEX...