![GEDA 1500z Скачать руководство пользователя страница 56](http://html1.mh-extra.com/html/geda/1500z/1500z_original-operating-manual_573459056.webp)
Operation
GEDA
®
1500 Z/ZP
Operating Manual
56 / 84
BL076 GB Edition 07.2015
4
Operation
The GEDA 1500 Z/ZP must only be operated by a competent
person, specifically appointed by the operating company.
This person must be familiar with the operating manual, have
sufficient experience and be informed about the risks involved in
handling the hoisting equipment.
Operating personnel refer to Chapter
4.1
Safety during operation
•
Also observe the safety instructions in Chapter
•
Load the platform as centrally as possible, observe the load capacity
of the equipment.
−
The platform must always be loaded in such a manner that the
loading and unloading access points and the control point remain
accessible.
−
Position the load carefully on the platform; material that might tend to
slip or is higher than the platform, or which could fall over, must be
secured (consider the possibility of sudden winds).
−
Do not transport bulky parts that project over the side of the platform.
•
Do not stand or work under the platform!
•
Do not place objects underneath the platform.
−
Store material at a safety distance of min. 50 cm from moving parts
of the machine.
•
The landing level safety doors can only be opened once the loading
ramp has been completely opened.
•
If the loaded platform stops during operation due to a malfunction,
then it is the responsibility of the operator to recover the load.
- Never leave a loaded platform unattended!
•
Operation of the transport platform must cease under the following
conditions:
−
Temperatures of less than -20 °C and more than +40 °C.
−
there is damage or other malfunctions.
−
A recurring inspection has been missed (refer to the maintenance
manual).