background image

General Information

 

 

GEDA

®

 1500 Z/ZP 

Operating Manual

 

12 / 84

 

BL076 GB Edition 07.2015 

 

1.7.1 

Requirements of assembly personnel 

The machine must only be assembled, operated and maintained by 
competent persons who, based on their training, knowledge and 
practical experience, can ensure correct handling of the machine and 
who are aware of the risks associated with the transport platform. 
These persons must be appointed to the tasks of installation, 
dismantling and maintenance by the operating company. 
 

1.7.2 

Operating personnel 

The machine may be operated only by persons who, based on their 
training, knowledge and practical experience, can guarantee proper 
handling.  
These persons must 

 

have been appointed by the operating company. 

 

have been appropriately instructed and informed about the risks. 

 

be familiar with the assembly and operating manual. 

 

observe national regulations 

 

1.7.3 

Improper use 

  The 

GEDA 1500 Z/ZP

 

  is not designed for permanent installation. 

  must not be set up to be free-standing (without anchors). 

  must not be operated by people who have not been trained on the 

machine, who are not familiar with the operating instructions or by 
children. 

 

Consequences of improper use of equipment 

 

Danger to life and limb of the user or a third party. 

 

Damage to the machine and other tangible assets. 

 

 

Содержание 1500z

Страница 1: ...BL 076 GB Edition 07 2015 Original operating manual Operating Manual Construction Hoist Transport Platform For persons and loads ...

Страница 2: ...General Information GEDA 1500 Z ZP Operating Manual 2 84 BL076 GB Edition 07 2015 ...

Страница 3: ...ervicing maintenance and troubleshooting 17 2 6 Safety whilst working on the electrics 19 3 Technical description 20 3 1 Description of function 20 3 1 1 Use as a material hoist 21 3 1 2 Use as a transport platform climbing platform 21 3 2 Machine equipment 22 3 2 1 Ground station switch box 25 3 2 2 Platform control 25 3 2 3 Ground control manual control 26 3 2 4 Drop test control 26 3 2 5 Platfo...

Страница 4: ...afety doors 59 4 2 1 1 1 m base enclosure with barrier option 59 4 2 2 Platform access ground station 60 4 2 3 Platform access building landing level 61 4 2 4 Landing level safety doors 62 4 3 Operating as a material hoist 63 4 4 Operating as transport platform 66 4 5 Operation for assembly 69 4 6 Emergency shutdown 71 4 7 Interrupting work end of work 71 5 Malfunctions Diagnosis Repair 72 5 1 Dia...

Страница 5: ...with the machine e g Operating fault rectification during work disposal of operating materials and auxiliary supplies assembly maintenance servicing general maintenance repairs and or transport You will come across a series of illustrations and symbols while reading this manual which are intended to help you navigate through and understand this manual The different meanings are explained below Tex...

Страница 6: ...d be very cautious Warning level Consequence Probability DANGER Death serious injury is imminent WARNING serious injury possible CAUTION minor injury possible CAUTION tangible damage possible Attention information This is found at points where special information or instructions and restrictions regarding damage prevention are given in order to prevent damage to the equipment Note This is found at...

Страница 7: ...lbf ft pounds per feet kg kilogram l litre gal gallons kip kilopound Nm Newton metre km h kilometres per hour mph miles per hour incl including if nec if necessary i e id est that is reg regarding RH relative humidity approx approximately Ø diameter registered trademark copyright TM trademark per cent per thousand dB A sound pressure level LWA sound power level greater than less than plus or minus...

Страница 8: ...utler Road USA 77573 League City Texas Tel 1 713 621 7272 Fax 1 713 621 7279 Web www gedausa com GEDA RUS LLC Yaroslavskoe shosse 42 129337 Moscow Russian Federation Tel 7 495 663 24 48 Fax 7 495 663 24 49 Web www geda ru com Turkey Subsidiary GEDA MAJOR IS VE INSAAT MAKINALARI SAN TIC LTD STI Semsettin Günaltay Cad No 224 A Blok K 2 D 5 Tüccarbasi Erenköy TR 34734 Istanbul Turkey Tel 90 216 478 2...

Страница 9: ...ersonal protective gear as appropriate to the local conditions First aid facilities first aid kit etc must be kept within reach The operating company user of the machine must not make any changes additions or modifications to the machine that could impair safety without permission from the manufacturer This also applies to installing and adjusting safety equipment as well as welding onto load bear...

Страница 10: ...from outside the cordoned off and signposted hazard area using the ground control and or operated from the electric modules on the landing level control above the lower safety area 2 m above the ground as transport platform and carrying persons Determined for the transport of material and a max of 7 persons who can exit the platform at installed and secured exit points It must only be used by trai...

Страница 11: ...om such action This applies equally to any arbitrary changes to the machine Intended use includes That the assembly operation and maintenance provisions assembly and operating manual provided by the manufacturer are complied with That the foreseeable misconduct of other persons is taken into consideration That the corresponding national regulations are complied with The GEDA 1500 Z ZP is suitable ...

Страница 12: ...erated only by persons who based on their training knowledge and practical experience can guarantee proper handling These persons must have been appointed by the operating company have been appropriately instructed and informed about the risks be familiar with the assembly and operating manual observe national regulations 1 7 3 Improper use The GEDA 1500 Z ZP is not designed for permanent installa...

Страница 13: ...both for personnel as well as for the environment and the machine Non compliance can lead to the forfeiture of any damage compensation claims 2 1 Residual risks There are still residual risks remaining from handling the machinery even when all safety conditions are complied with Everyone who works on and with the machine must be aware of these hazards and follow instructions that prevent these res...

Страница 14: ... and defects Immediately report any changes including changes to the operating behaviour to the office person in charge If necessary shutdown and secure the machine immediately The responsibilities for different jobs within the context of operation servicing and maintenance of the machine must be clearly stipulated and adhered to This is the only way to avoid mistakes especially in hazardous situa...

Страница 15: ... sling gear round slings lifting straps sling ropes chains for transport at the assembly site When selecting hoisting equipment always take into account the maximum suspended loads Please refer to the dimensions and weights in the technical specifications chapter 3 4 Only carefully load and transport equipment that has been disassembled packaged and lashed Always ensure that the machine is transpo...

Страница 16: ... operating personnel or the machine shut down the machine by pressing the EMERGENCY STOP button Shut down and lower the machine when wind speeds are 72 km h Wind force 7 8 wind breaks branches off trees makes walking very difficult No one is allowed to stand under the machine Ensure that the danger zone is suitably cordoned off at the customer s site Install the base enclosure and underride protec...

Страница 17: ...s therefore prohibited If it is necessary to turn the machine on during such work then this must only be done while complying with special safety measures For further instructions about maintenance maintenance intervals servicing refer to the maintenance manual If the machine has been completely shut down for these tasks it must be secured against switching on unintentionally Activate the EMERGENC...

Страница 18: ...devices If it is necessary to remove safety devices during servicing and repairs the safety devices must be installed and checked immediately after completion of servicing and repair tasks Do not make any changes additions or modifications to the machine This also applies to the installation and adjustment of safety devices such as limit switches Immediately replace damaged or detached notices and...

Страница 19: ...ork is to be carried out must be disconnected from the mains Operating fluids that have been disconnected must be secured against being switched back on unintentionally or automatically lock away fuses block isolating switches etc The disconnected electrical components must first be tested to ensure they are voltage free then earthed short circuited and isolated from neighbouring live components I...

Страница 20: ... area the lifting speed of the platform is approx a max of 12 m min travel is only possible using dead man s control Stops the platform coming from the top Before starting each time a signal is emitted in this area for approx 3 seconds Cannot be operated from the landing level control The platform openings barrier door assembly guard assembly frame are electrically monitored and interrupts the saf...

Страница 21: ... persons and materials It must only be used by trained personnel platform operator who receive the key to activate the platform control When the sliding plate cover over the platform control is pushed upwards and the key switch on the platform control is switched on by the platform operator the machine is used as a transport platform or mast climbing platform The maximum number of persons on the p...

Страница 22: ...hine equipment 1 Foot section with base mast 7 Underride protection 2 Cable basket 8 Assembly guard 3 Platform Example BS 9 Mast sections 4 Platform access ground station door 10 Landing level safety door 5 Platform access building barrier with loading flap 6 Drive motors 4 5 1 6 3 7 2 8 10 9 ...

Страница 23: ...BL076 GB Edition 07 2015 23 84 Operating Manual 6 Drive motor 6A Brake release lever 11 Switch box Ground station 11A Mains plug 12 Switch box trolley 13 Trailing cable and cable holder 14 Automatic lubrication device 12 11 6 6A 14 11A 13 ...

Страница 24: ... Z ZP must not be operated without a cordoned off area Cordon off and indicate the hazard area The distance of the cordoned off area to moving hoist parts must be a minimum of 0 5 m and maximum of 2 0 m DANGER Danger to life By crushing Never remain inside the cordoned off area during operation Turn off the main switch and secure it from being switched on whilst working inside the cordoned off are...

Страница 25: ...tric module on the landing level safety doors or dummy plug during assembly 3 2 2 Platform control 1 EMERGENCY STOP button 2 LANDING LEVEL STOP button 3 UP button 4 DOWN button 5 Key switch Position down 0 Manual control or landing level control is active Position up 1 Platform control is active 6 Sliding plate cover for the platform control bottom operating mode construction hoist 7 Lock for latc...

Страница 26: ...2 Selector switch MANUAL I AUTOMATIC II 3 UP button 4 DOWN button 5 Hanging bracket 3 2 4 Drop test control To be used only by authorized personnel The drop test control is used exclusively to carry out a drop test or to raise if the platform has moved too far down 1 EMERGENCY STOP button 4 UP button 3 Rotary button release brake 1 2 3 4 5 1 2 3 ...

Страница 27: ...ed if the platform is stationary on the ground stopped by the DOWN LIMIT switch Emergency unlocking In event of a power cut the magnet lock can be manually released Insert the triangular wrench 3 into the lock Turn the key 3 and simultaneously press the door locking lever 1 2 Latching bolt Release and remove the key Open the platform access 1 2 3 3 ...

Страница 28: ...DA 1500 Z ZP Operating Manual 28 84 BL076 GB Edition 07 2015 3 2 6 Platform access building The platform access to the building barrier with loading flap must only be opened when the platform is actually located at the landing ...

Страница 29: ...GEDA 1500 Z ZP Technical description BL076 GB Edition 07 2015 29 84 Operating Manual Unloading flap large The platform ED and GD have a large unloading flap 1 Unlocking lever for opening the barriers 1 ...

Страница 30: ...015 3 2 7 Overrun and cable protection The proximity switch 2 switches off before the drive pinion leaves the gear rack e g during assembly or before the traction on the trailing cable holder 1 is too great The correct distance from proximity switch to gear rack is 3 7 mm 1 3 7 mm 2 ...

Страница 31: ...l Spare parts lists Circuit diagrams Operating instructions of the operating company Rescue plan of the operating company These documents can also be kept by the operating company and taken to the machine as required 3 2 9 Operating time indicator An operating hours counter 1 is installed in the trolley switch box to record the operating hours motor operating time The switch box must be opened to ...

Страница 32: ...ing Never remain inside the cordoned off area during operation When operating without underride protection the base enclosure with barrier must be installed The four sided base enclosure consists of extendible elements 2 and one element with barrier 1 Height 1 1 m Distance to moving hoist parts min 0 5 m The barrier can optionally be installed to open to the left or to the right 2 1 ...

Страница 33: ... cordoned off and the danger zone marked distance of approx 0 5 m to 2 0 m moving hoist parts Function Protect the hoist against damage whilst moving onto obstacles Protect people anomalously standing below the platform from crushing when the platform moves downwards When the underride protection is raised control is interrupted by a limit switch which makes travel impossible Before travel is agai...

Страница 34: ...g points where there is a risk of falling from a height of more than 2 m Only landing level safety doors for the checked and approved GEDA hoists must be used in conjunction with the platforms that ensure safe transit to the building GEDA landing level safety gates that have been inspected and acceptance tested with the GEDA 1500 Z ZP and comply with these requirements Item No 01212 Item No 01217 ...

Страница 35: ...uipment Extension cable 20 m Assembly Comprehensive instructions for assembly are only described in the assembly manual of the landing level equipment Install the electric module on the sliding door mounting of the landing level equipment and attach with the wing nut 4 The supply line 2 7 pole plug red from the first electric module is connected to the ground station at the switch box If there are...

Страница 36: ...ion 07 2015 3 3 5 Assembly bridge The assembly bridge is a small fold out platform which aids anchoring the mast sections from the platform can also be used in front of a facade without frontal scaffolding The assembly bridge must only be used during assembly and disassembly ...

Страница 37: ...el For platform A B BS BL and BLL For example Platform BS It is possible to fold back the roof plate 1 and swivel it to the side to mount the mast sections Also refer to the assembly drawing WARNING Risk of injury Each time before you fold back the roof plate you must check whether there are any components stones or other construction material lying on the roof Always clear the roof before folding...

Страница 38: ...GB Edition 07 2015 Operating the platform with the roof plate folded back Fix the roof plate on both sides using the eyebolts 2 Operating the platform with the roof plate swung up Fold the roof plate 1 upwards and bolt it tight on both sides using the eyebolts 2 2 1 2 ...

Страница 39: ...ample Platform F 2 Assembly aperture To assemble the mast section the roof 1 can be opened from the masts WARNING Risk of injury Each time before dismantling the assembly aperture 2 check whether there are any parts stones or other construction material lying on the roof Before the assembly aperture 2 is dismantled always clear the roof 1 2 2 ...

Страница 40: ...ible to transport loads that are taller than the platform e g scaffolding tubes secured from falling Mounting the scaffold bracket You mount the scaffold bracket on the roof plate 1 Mount the scaffold bracket 2 on the top of the roof plate 1 You must tighten the bolts such that it is just possible to move swivel the scaffold bracket You must keep checking this setting and tighten the bolts if nece...

Страница 41: ... the roof plate 1 on the bottom locking bolts at the level of the scaffold bracket on the roof bracket 3 You must fix the roof plate on both sides using the eyebolts 4 Operating the scaffold bracket Fold out the scaffold bracket 2 2A Bracket for safe transportation of tubes 2B Chain to secure planks toeboards and scaffold planks 3 1 4 2A 2B 2 ...

Страница 42: ...ng this holder 1 The tubes and scaffolding couplings are not included in the scope of delivery Suggestion for a contact frame Material required 2 tubes 1 5 in length approx 2 m 1 tube 1 5 in length approx 1 6 m and 2 scaffolding couplings Attach the vertical tubes to the platform struts using the special couplings 3 Fit a crosspiece 2 at an easily reachable height approximately 2 m using scaffold ...

Страница 43: ...cover 1 on the cable bin Assembly Assembly of the cable bin cover 1 is described in separate instructions 3 3 10 Cold package The GEDA 1500 Z ZP can be used up to 20 C In countries where work is carried out at lower temperatures it is recommended to install a cold package A thermostat 1 in the switch box switches off upward travel at temperatures of less than 20 C 1 1 ...

Страница 44: ... storm Here the operating company must provide appropriate regulations Atmosphere Transporting persons The atmospheric composition must be appropriate for persons in this area In particular reduction in the oxygen concentration as a result of displacement or consumption must be prevented The legal limit values for pollutant concentrations aerosols and dust in the workplace must not be exceeded Tra...

Страница 45: ...A site distribution cabinet in accordance with IEC 60439 4 2005 with fuse protection of the supply point min 3 x 32 A slow to blow and a Residual Current Device RCD with a rated current of max 0 03 A required Base unit Operating voltage 400 V 50 Hz 3 x 32 A 3 Ph N PE Protection class IP 54 NEMA 3 Drives 400 V 50 Hz Rating 2 x 3 6 1 kW 6 0 12 2 KW Power consumption 2 x 7 5 13 8 A 15 27 6 A Start up...

Страница 46: ...0 Nm First mast tie 6 m Vertical distance mast ties 10 m Vertical distance travelling cable guide 6 m Max protruding mast length Operation Platform A C D E ED F G GD H I Platform B BS BL BLL Assembly 6 0 m 2 0 m 9 5 m Vertical inclination of the mast Vertical assembly max 2 mm per mast section Check inclination during and following installation using appropriate means Thermal expansion of mast 0 0...

Страница 47: ...apacity decreases accordingly Base unit without platform 970 kg Platform A Load capacity max Construction hoist 2000 kg Transport platform 2000 kg max 7 persons 1900 kg 1 1800 kg 2 1700 kg 3 1600 kg 4 1500 kg 5 1400 kg 6 1300 kg 7 Assembly 1000 kg Platform dimensions w x l x h approx 1 45 m x 1 65 m x 1 1 m 1 8 m Number of access points 1 x loading 1 x unloading Weights Base unit with platform 137...

Страница 48: ...x 1 1 m 1 8 m Number of access points 1 x loading 1 x unloading Weights Base unit with platform 1580 kg Roof 56 kg Underride protection 33 kg Platform BS Load capacity max Construction hoist 2000 kg Transport platform 2000 kg max 7 persons 1900 kg 1 1800 kg 2 1700 kg 3 1600 kg 4 1500 kg 5 1400 kg 6 1300 kg 7 Assembly 500 kg Platform dimensions w x l x h approx 1 45 m x 3 35 m x 1 1 m 1 8 m Number ...

Страница 49: ...m x 1 1 m 1 8 m Number of access points 1 x loading 1 x unloading Weights Base unit with platform 1670 kg Roof 78 kg Underride protection 45 kg Platform BLL Load capacity max Construction hoist 1000 kg Transport platform 1000 kg max 7 persons 900 kg 1 800 kg 2 700 kg 3 600 kg 4 500 kg 5 400 kg 6 300 kg 7 Assembly 500 kg Platform dimensions w x l x h approx 1 45 m x 4 95 m x 1 1 m 1 8 m Number of a...

Страница 50: ... x 1 1 m 1 8 m Number of access points 2 x loading 1 x unloading Weights Base unit with platform 1560 kg Roof 114 kg Underride protection 33 kg Platform D Load capacity max Construction hoist 2000 kg Transport platform 2000 kg max 7 persons 1900 kg 1 1800 kg 2 1700 kg 3 1600 kg 4 1500 kg 5 1400 kg 6 1300 kg 7 Assembly 1000 kg Platform dimensions w x l x h approx 2 9 m x 1 65 m x 1 1 m 1 8 m Number...

Страница 51: ... 8 m Number of access points 2 x loading 2 x unloading Weights Base unit with platform 1635 kg Roof 114 kg Underride protection 33 kg Platform ED Load capacity max Construction hoist 2000 kg Transport platform 2000 kg max 7 persons 1900 kg 1 1800 kg 2 1700 kg 3 1600 kg 4 1500 kg 5 1400 kg 6 1300 kg 7 Assembly 1000 kg Platform dimensions w x l x h approx 2 9 m x 1 65 m x 1 1 m 1 8 m Number of acces...

Страница 52: ... x 1 1 m 1 8 m Number of access points 2 x loading 1 x unloading Weights Base unit with platform 1785 kg Roof 150 kg Underride protection 49 kg Platform G Load capacity max Construction hoist 2000 kg Transport platform 2000 kg max 7 persons 1900 kg 1 1800 kg 2 1700 kg 3 1600 kg 4 1500 kg 5 1400 kg 6 1300 kg 7 Assembly 1000 kg Platform dimensions w x l x h approx 4 35 m x 1 65 m x 1 1 m 1 8 m Numbe...

Страница 53: ...1 8 m Number of access points 2 x loading 1 x unloading large loading flap Weights Base unit with platform 1840 kg Roof 150 kg Underride protection 49 kg Platform H Load capacity max Construction hoist 2000 kg Transport platform 2000 kg max 7 persons 1900 kg 1 1800 kg 2 1700 kg 3 1600 kg 4 1500 kg 5 1400 kg 6 1300 kg 7 Assembly 1000 kg Platform dimensions w x l x h approx 4 35 m x 1 65 m x 1 1 m 1...

Страница 54: ...t 2000 kg Transport platform 2000 kg max 7 persons 1900 kg 1 1800 kg 2 1700 kg 3 1600 kg 4 1500 kg 5 1400 kg 6 1300 kg 7 Assembly 1000 kg Platform dimensions w x l x h approx 4 35 m x 1 65 m x 1 1 m 1 8 m Number of access points 2 x loading 1 x unloading Weights Base unit with platform 1785 kg Roof 150 kg Underride protection 49 kg ...

Страница 55: ...anual Cable bin with trailing cable 25 m lifting height 72 kg 50 m lifting height 90 kg 75 m lifting height 108 kg 100 m lifting height 126 kg Assembly bridge Load capacity 120 kg Weight each 40 kg Chain sling for crane loading Load capacity 0 45 4300 kg 45 60 3000 kg Weight 34 kg ...

Страница 56: ...arefully on the platform material that might tend to slip or is higher than the platform or which could fall over must be secured consider the possibility of sudden winds Do not transport bulky parts that project over the side of the platform Do not stand or work under the platform Do not place objects underneath the platform Store material at a safety distance of min 50 cm from moving parts of th...

Страница 57: ...ration as a transport platform Operation of the transport platform must be carried out exclusively from the platform control Particular care is required near ground level A max of 7 person including the platform operator may be transported whereby the corresponding proportion of transported materials must be reduced Comply with the instructions of the platform operator Do not reach or lean out ove...

Страница 58: ...e opened at the ground station the assembly guard is lowered an assembly bridge is open the safety gear has triggered A landing level safety gate is open only when using the electric module Alarm signal function test When descending the platform must stop approx 2 m above the ground Thereupon a warning signal must sound for approx 3 seconds During this time the control function is blocked Likewise...

Страница 59: ...nclosure with barrier option DANGER Danger to life By crushing Never linger inside the base enclosure during operation When operating without underride protection a base enclosure must be installed The platform can be driven only when the barrier of the base enclosure is closed Open Raise the barrier 1 up Close Lower the barrier 1 until it lies on the enclosure posts 1 ...

Страница 60: ...form access ground station Loading door This access point to the platform can only be opened if the platform is stopped by the down limit switch at the ground station Open Pull the unlocking lever 1 and open the door Close Close the door and push downwards until the lock 2 engages 1 2 ...

Страница 61: ...y be opened when the car is located at the landing level in front of a landing level safety gate Open Push pull the barrier 1 towards the platform and swing it up The loading door opens automatically and presses downwards the brim plate of the landing level equipment Close Lower the barrier 1 until it engages in the lock 2 The loading door closes automatically 1 2 ...

Страница 62: ...ly possible to open the landing level safety door when the unfolded unloading ramp is in contact with the threshold of the landing level safety door Open Press the lever 2 in the direction of the arrow and push open the sliding door 1 Close Close the sliding door 1 until the lever 2 engages downwards Landing gate 01217 01268 Landing gate 01212 01213 2 1 1 2 ...

Страница 63: ...tion switch on the main switch Position I ON Turn the key in the key switch on the platform control to the left position 0 and remove the key Push down the sliding plate 6 the cover of the platform control downwards Secure the hinged plate with a lock 7 1 EMERGENCY STOP button The ground control and electric modules of the landing level safety doors are active The machine can now be used as a mate...

Страница 64: ...bar and is stopped by the UP limit switch Descent Press and hold the DOWN button 4 The platform only moves as long as the button DOWN 4 is pressed The platform stops before the bottom safety area about 2 m above the ground WARNING Platform operators are only allowed to continue travel after ensuring that the path of travel downwards is clear Press the DOWN button 4 again and keep it pressed The sy...

Страница 65: ...ease the UP button 3 The platform automatically travels onward to the next landing and stops there For continuous through travel to the second landing keep the UP button 3 pressed until the limit switch approach bar for the first landing is overrun Descent Press and release the DOWN button 4 The platform travels downwards and stops before the lower safety area WARNING Platform operators are only a...

Страница 66: ...ors above 2 m The ramp barrier with unloading ramp and assembly bridge must be closed and engaged The assembly guard must be properly hung up Turn the main switch on the switch cabinet of the ground station to I position ON Remove the lock 7 that secures the cover Push the sliding panel 6 upwards over the platform control and secure it again with the lock 7 Insert the key 5 into the key switch and...

Страница 67: ...ding level equipment for loading and unloading the platform must be stopped so that it is level with the landing level safety door You must have installed a LANDING up limit switch activating plate appropriate to the landing level safety door refer to the installation instructions Before reaching the landing level safety door press the LANDING STOP button 2 in addition to the UP button 3 The platf...

Страница 68: ...escent Release the DOWN button 4 The platform descends and automatically stops above the lower safety area about 2 m above the ground WARNING The platform operator can only continue travel after ensuring that the path of travel downwards is clear Again press and hold the DOWN button 4 The system issues an alarm signal and after about 3 seconds the platform starts up and stops at the DOWN limit swi...

Страница 69: ...e closed and engaged The assembly guard must be properly hung up Turn the main switch on the switch cabinet of the ground station to I position ON Remove the lock 7 that secures the cover Push the sliding panel 6 upwards over the platform control and secure it again with the lock 7 Insert the key 5 into the key switch and turn to the right position 1 to activate the platform control Only the platf...

Страница 70: ... while you keep pressing the DOWN button 4 1 EMERGENCY STOP button Stopping descent Release the DOWN button 4 The platform descends and automatically stops above the lower safety area about 2 m above the ground WARNING The installation personnel can only continue travel after ensuring that the path of travel downwards is clear Again press and hold the DOWN button 4 The system issues an alarm signa...

Страница 71: ...ll it out There is a Stop button on the electric modules of the landing level safety doors with which travel can be stopped from each landing This stop button does not engage which means that further travel is immediately possible after the stop command 4 7 Interrupting work end of work Move the platform downwards until it stops at the DOWN limit switch If there is a risk of frost move the platfor...

Страница 72: ... be carried out by persons specially trained and authorized for this Before troubleshooting if possible lower the platform and unload Immediately discontinue operation if faults occur that endanger operational safety DANGER Electric shock Shut off and secure the main switch before working on the electrical system of the transport platform For safety reasons remove the mains plug ...

Страница 73: ...t platform access to the building barrier with loading door is not locked 7 Illuminates when the right platform access to the building barrier with loading door is not locked 8 Illuminates when the platform access ground station double door is not locked 9 Illuminates when the platform access to the building double door is not locked 10 Illuminates when the limit switch of the assembly guard is ac...

Страница 74: ...trol point pressed Loading door open Barrier with loading door open Assembly guard plate open Assembly bridge open EMERGENCY limit switch has activated Base enclosure barrier open Option Safety gear engaged Key switch on the platform control switched to incorrect operating mode Unlock the EMERGENCY STOP button Close loading door Close barrier with loading door Attach assembly guard plate at the to...

Страница 75: ...does not open Platform is stationary not stopped by the DOWN limit switch Door lock defective No voltage Move platform to the DOWN limit switch Door EMERGENCY unlock Replace defective lock Connect power supply 5 3 Fault rectification 5 3 1 Motor is not producing full output Voltage drop of more than 10 of the rated voltage Select supply cable with larger cross section If overloaded the integrated ...

Страница 76: ...elease Actions Connect the drop test control refer to Chapter 5 3 5 From outside the platform press the UP button 1 Now the platform moves out of the END position The UP button 1 must be pressed because this control bridges the Emergency limit switch If the rotary button is inadvertently activated the motor brake is released and the motor can drop hard onto the foot section risk of damage After ne...

Страница 77: ... possible 5 3 5 Safety gear has triggered The transport platform is equipped with an overspeed safety device that halts the platform if overspeed is detected Further travel is not possible once the safety gear has been triggered WARNING Danger to life All persons must exit the platform Determine why the safety gear has engaged secure the platform and repair the damage before releasing the safety g...

Страница 78: ...e platform up by approx 20 30 cm After neutral running disconnect the drop test control again and plug in the dummy plug 1 on the plug in connection 2 Release the lock nut 4 on the safety gear Turn the safety gear protective cover 5 to the left until the limit switch lug 6 engages in the slot of the protective cover 5 Re tighten the lock nut 4 After the safety gear has activated it must be checked...

Страница 79: ... rescue personnel 5 4 1 Basic conduct in the event of a rescue malfunction Get an overview of the situation Remain calm and do not act hastily Be cautious and thorough when checking the situation Is anybody hurt Keep unauthorised persons away Contact any persons trapped in the car Try to find out the cause of the malfunction defect in the system e g Power failure Trigger the safety gear As necessa...

Страница 80: ...o continue travel The platform moves Action 2 Self rescue using EMERGENCY lowering The EMERGENCY descent function is used only in an emergency to reach the next lowest landing Hereby persons trapped can evacuate themselves WARNING Trigger the safety gear The brake release lever must be operated extremely carefully to prevent the safety gear from engaging If the safety gear has engaged once it will...

Страница 81: ...g with platform versions B BS BL and BLL Attach the two provided cables with the loops to the brake release lever and as depicted in the adjacent figure guide them together in the centre Release the motor brakes by measured pulling on the ropes 2 The platform glides downwards CAUTION The brake becomes very hot Interrupt the lowering process for 2 minutes at the latest after every 1 2 meters The le...

Страница 82: ...NG Now check to make sure that no parts of the drive system are broken damaged or unserviceable In this case the safety gear must not be released The transport platform must be decommissioned Action 3 Rescue in accordance with the emergency rescue plan of the operating company An emergency rescue plan must be prepared by the operating company and kept in a clearly visible place on the transport pl...

Страница 83: ... this operating manual When ordering spare parts please provide the following Type Year of manufacture Serial No Operating voltage Quantity required The nameplate is located on the trolley of the base unit Spare parts must conform to the technical specifications of the manufacturer Only use original spare parts from GEDA For service or repair work please contact our customer service department For...

Страница 84: ... its service life and dispose of according to national provisions Observe the following when disposing of equipment components Drain and dispose of oil grease in an eco friendly way Recycle metal parts Recycle plastic parts Recommendation Contact the manufacturer or commission a specialist company to handle disposal requirements in accordance with regulations ...

Отзывы: