GEDA
®
1500 Z/ZP
General safety information
BL076 GB Edition 07.2015
17 / 84
Operating Manual
2.5
Safety instructions for servicing, maintenance and
troubleshooting
Operating personnel
must be
informed
about how to carry out special
work and maintenance work before they start.
Deadlines
that are stipulated or stated in the operating manual for
recurring
tests/inspections
must be adhered to.
The
maintenance area
must be
cordoned off
as extensively as
required!
Fundamentally, before any maintenance work on the machine
−
unload,
−
Switch off at the master switch.
All
servicing and maintenance tasks
are only permitted with the
master switch turned off
or with the
mains plug disconnected
.
Manual intervention while the machine is running can lead to serious
injury and is therefore prohibited. If it is necessary to
turn the machine
on during
such work, then this must only be done while complying with
special safety measures
.
For further instructions about maintenance / maintenance intervals
/ servicing, refer to the maintenance manual.
If the machine has been completely shut down for these tasks, it must
be secured against switching on unintentionally:
Activate the
EMERGENCY STOP
button,
Lock
the
main switch
using a shackle lock
and
Attach a warning notice
to the switch box (main switch).
Any faults that could impair safety must be rectified immediately.
Workshop equipment
that is suitable for the specific work is
imperative for carrying out
servicing and maintenance tasks
.
When carrying out maintenance tasks at greater height, a fall-protection
device must be worn! Keep all handles, railings and the platform free
from dirt and contamination.
When working under the platform, secure it using appropriate means
(e.g. bolts, mast clamps, etc.)