
3.1.5.9 Labelling of the control / control cabinet
(information plate)
•
Label on the rear side of the control unit of the control system (visible after
opening the switching cabinet):
–
Project name
–
Build number of the product
–
MPI address
•
Label on the inside of the switching cabinet:
–
Test verification for the control system
Fig.21:
Test verification for the control system
3.1.5.10 Designation of the earthing connection
Safety labels
Fig.22:
Designation of the earthing connection
Importance of the labels
Ensure that the product is properly grounded before start-up. Connect the earth-
ing connection. The necessary mounting hardware and cables are
not
included
in the scope of delivery.
See general assembly drawing for the position of the earthing connections.
Description
Design
L_151511_2
19.12.2019
47
Содержание RedGenium
Страница 6: ...L_151511_2 6 19 12 2019...
Страница 8: ...L_151511_2 8 19 12 2019...
Страница 14: ...L_151511_2 14 19 12 2019...
Страница 118: ......