Initial Commissioning
Safety instructions for initial commissioning
2007-9015-001
03-2014
6
Initial Commissioning
6.1
Special personnel qualification required for initial commissioning
Initial commissioning may only be performed by specially qualified personnel in
accordance with the safety instructions.
6.2
Safety instructions for initial commissioning
Caution!
Always open 2 ball valves under the hydraulic power unit before
operating the equipment. Operating the hydraulic power unit with
closed ball valves will result in failure and/or injuries due to excess of
pressure in the oil filter.
To prevent damage to property and/or life-threatening injury to personnel
always follow these instructions:
● Before starting for the first time, check that all tools and other parts have
been removed from the danger area.
● Make sure all electrical connections and safety devices are properly
installed to meet local and national regulations.
● Check the direction of rotation of the motor before commissioning.
Also read the chapter on ”Safety”.
Special risks involved in initial commissioning:
● Incorrectly wired connections may destroy electrical/electronic
components.
● Defective connections can cause the product to start up unexpectedly or
make uncontrolled movements.
● Wrong connections will cause the motor to run in the wrong direction - which
may cause serious damages to property and/or cause life-threatening
injuries.