Installation
Installation of the evacuation line
2007-9015-001
03-2014
Connection of sacrificial anode
Attention!
Anodes must be connected and activated before they are buried.
Hardware supplied with each sacrificial anode:
1 - ¾-10 NC x 2” [19 mm X 5 cm] . . . .
bolt
2 - ¾” [19 mm] . . . . . . . . . . . . . . . . . . . .
washers
1 - ¾-10 NC [19 mm] . . . . . . . . . . . . . .
nut
● Grind the sides of the joint brackets
to remove coating and expose bare
metal;
Grind here
● Strip the length of wire required to
make a single loop around the bolt;
● Hook the stripped wire to the bolt
between 2 washers.
● Do not overlap the wire since it may
cut itself when tightening the nut;
copper wire of the
sacrificial anode
Stripped wire
¾” [19 mm]
washers
● Cover each wire connection bolt with
a thick layer of tar.
Tar
Attention!
When maneuvering the steel pipes, inspect the pipe for any scratches
in the coating. Coat all scratches with tar to protect from corrosion;
Attention!
The sacrificial anode must be set parallel and at 18” [45 cm] from the
component it protects. The anode can be installed above or beside the
evacuation line;