5.5 Checking the pneumatic connection
5.5.1 Air requirement
Actuator type
Actuator Ø
[mm]
Air requirement (dm
3
n
/stroke)
dm
3
n
at 1.01325 bar
at 0 °C as per DIN 1343
E_AA
85
0.13
E_BA
104
0.23
E_BB
140
0.23
E_CA
129
0.37
E_CB
129
0.37
E_CD
129
0.37
E_DD
169
0.61
E_DF
169
0.61
5.5.2 Establishing hose connections
INFO
To ensure reliable operation, the compressed air hoses must be cut exactly
at a right angle.
Tools
●
Hose cutter
1.
Shut off the compressed air supply.
2.
Use the hose cutter to cut the pneumatic hoses at a right angle.
3.
Push the air hose into the air connector on the control top.
4.
Re-open the compressed air supply.
Þ
Hose connection has been established.
5.5 Checking the pneumatic connection - 37 / 128
Содержание ECOVENT
Страница 6: ...6 128 Table of Contents 0000000607 002 EN GB...
Страница 9: ...1 4 Declarations of conformity 1 4 Declarations of conformity 9 128...
Страница 12: ...12 128 1 4 Declarations of conformity 0000000607 002 EN GB...
Страница 20: ...20 128 2 10 Emergency measures 0000000607 002 EN GB...
Страница 40: ...40 128 5 5 Checking the pneumatic connection 0000000607 002 EN GB...
Страница 44: ...44 128 7 3 Shutdown 0000000607 002 EN GB...
Страница 106: ...106 128 9 7 Maintenance 0000000607 002 EN GB...
Страница 111: ...Spare parts list shuttle valve 221ELI011013EN_9 14 03 2023 2 Fig 3 with control top T VIS 12 2 Spare parts list 111 128...
Страница 120: ...120 128 12 2 Spare parts list 0000000607 002 EN GB...
Страница 127: ...13 2 List of abbreviations 127 128...