2.
Pressurize the actuator - with com-
pressed air, max. 8 bar (air connection
61).
®
The valve disk is raised.
3.
Remove clamp connection (43) be-
tween the upper and middle housing.
4.
Depressurize the actuator (air connec-
tion 61).
®
The valve disk is lowered.
The valve insert is pushed out of
the housing.
35.1
61
43
Þ
The clamp connection between the upper and middle housing has been disman-
tled.
9.5 Removing the valve - 57 / 128
Содержание ECOVENT
Страница 6: ...6 128 Table of Contents 0000000607 002 EN GB...
Страница 9: ...1 4 Declarations of conformity 1 4 Declarations of conformity 9 128...
Страница 12: ...12 128 1 4 Declarations of conformity 0000000607 002 EN GB...
Страница 20: ...20 128 2 10 Emergency measures 0000000607 002 EN GB...
Страница 40: ...40 128 5 5 Checking the pneumatic connection 0000000607 002 EN GB...
Страница 44: ...44 128 7 3 Shutdown 0000000607 002 EN GB...
Страница 106: ...106 128 9 7 Maintenance 0000000607 002 EN GB...
Страница 111: ...Spare parts list shuttle valve 221ELI011013EN_9 14 03 2023 2 Fig 3 with control top T VIS 12 2 Spare parts list 111 128...
Страница 120: ...120 128 12 2 Spare parts list 0000000607 002 EN GB...
Страница 127: ...13 2 List of abbreviations 127 128...