8.1.2 Cleaning results
The cleaning result depends on the following factors:
●
Temperature
●
Time
●
Mechanics
●
Chemicals
●
Degree of soiling
These factors can be combined in such a way as to make an optimal cleaning result
probable.
8.2 Passivation
Before a system with long pipes and tanks is commissioned, it usually needs to be pas-
sivated.
Valve blocks are usually excepted from this.
Passivation is usually carried out with nitric acid (HNO
3
) at about 80 °C (176 °F) in a
concentration of 3 % and a contact time of 6 to 8 hours.
46 / 128 - 8.2 Passivation
0000000607 - 002 - EN-GB
Содержание ECOVENT
Страница 6: ...6 128 Table of Contents 0000000607 002 EN GB...
Страница 9: ...1 4 Declarations of conformity 1 4 Declarations of conformity 9 128...
Страница 12: ...12 128 1 4 Declarations of conformity 0000000607 002 EN GB...
Страница 20: ...20 128 2 10 Emergency measures 0000000607 002 EN GB...
Страница 40: ...40 128 5 5 Checking the pneumatic connection 0000000607 002 EN GB...
Страница 44: ...44 128 7 3 Shutdown 0000000607 002 EN GB...
Страница 106: ...106 128 9 7 Maintenance 0000000607 002 EN GB...
Страница 111: ...Spare parts list shuttle valve 221ELI011013EN_9 14 03 2023 2 Fig 3 with control top T VIS 12 2 Spare parts list 111 128...
Страница 120: ...120 128 12 2 Spare parts list 0000000607 002 EN GB...
Страница 127: ...13 2 List of abbreviations 127 128...