Model T17 Installation Guide
13
Chapter 2. Installing the Pipe Nozzles
2.2.4 Installing the First Welding Boss - Diametrical (cont.)
3.
Position the welding boss so that the four scribe lines on the welding boss are lined up with the horizontal
scribe mark and the oblique center line on the pipe. Make sure you orient the tapered end of the welding boss
against the pipe as shown in
below.
Figure 18: Welding Boss Orientation
4.
Clamp the welding boss in place using a pipe strap or equivalent, so that it cannot move during tack welding.
5.
Check the boss alignment, then tack weld the carbon steel welding boss to the pipe in each of the four grooves
between the welding boss scribe marks.
6.
Remove the clamp and check the welding boss alignment again. If the welding boss is misaligned by
0.02 in. (0.5 mm) or more, remove the welding boss, grind off the welds and reinstall it.
Oblique Center Line Scribe Mark
Horizontal Scribe Mark
Top View
Side View
Содержание T17
Страница 1: ...GE Oil Gas Flow 916 128 Rev D September 2020 Model T17 Ultrasonic Flow Transducer Installation Guide ...
Страница 2: ......
Страница 4: ...ii no content intended for this page ...
Страница 62: ...Chapter 2 Installing the Pipe Nozzles 54 Model T17 Installation Guide no content intended for this page ...
Страница 64: ...Chapter 3 Installing an Isolation Valve 56 Model T17 Installation Guide no content intended for this page ...
Страница 88: ...Chapter 6 Specifications 80 Model T17 Installation Guide no content intended for this page ...
Страница 90: ...Warranty 82 Model T17 Installation Guide no content intended for this page ...
Страница 92: ......
Страница 93: ......