Chapter 2. Installing the Pipe Nozzles
10
Model T17 Installation Guide
2.2.3 Determining and Marking the Second Nozzle Location - Diametrical (cont.)
5.
Remove the strip of film and fold it as shown in
below to determine the position which is
diametrically opposite the overlap position when the film is reapplied to the pipe.
Figure 12: Folding the Film
6.
Mark the outside of the fold for reference, as shown in
below.
Figure 13: Marking the Film
7.
Place the strip of film back on the pipe. This time, line up the overlap mark with the horizontal and vertical
scribe lines (see
below). Again, make sure you wrap the strip of film squarely around the pipe.
Figure 14: Placing the Film on the Pipe
Overlap Mark
Fold to Here
Mark the Edge
Overlap Mark
First Edge
Side View
Содержание T17
Страница 1: ...GE Oil Gas Flow 916 128 Rev D September 2020 Model T17 Ultrasonic Flow Transducer Installation Guide ...
Страница 2: ......
Страница 4: ...ii no content intended for this page ...
Страница 62: ...Chapter 2 Installing the Pipe Nozzles 54 Model T17 Installation Guide no content intended for this page ...
Страница 64: ...Chapter 3 Installing an Isolation Valve 56 Model T17 Installation Guide no content intended for this page ...
Страница 88: ...Chapter 6 Specifications 80 Model T17 Installation Guide no content intended for this page ...
Страница 90: ...Warranty 82 Model T17 Installation Guide no content intended for this page ...
Страница 92: ......
Страница 93: ......